SUPPLEMENTS TO THE AIP (AIP SUP)

AIP SUP contains temporary changes of long duration (three months and longer) and information of short duration which consists of extensive text and/or graphics, supplementing the permanent information contained in the AIP. Operationally significant temporary changes to the AIP are published in accordance with the AIRAC system.

AIP Supplements contains information affecting international civil aviation and is given international and national distribution 


Currently valid SUPs:

AIP SUP 21/24

ESTABLISHEMENT OF CRANE AND ADJUSTMENT OF RELATED AD OPERATING MINIMA, FLIGHT PROCEDURES CHARTS AT TAN SON NHAT AERODROME (VVTS)

AIP SUP 20/24

TEMPORARILY SUSPENDING THE OPERATION OF THE SEQUENCED FLASHING LIGHT SYSTEM AT PHU QUOC INTERNATIONAL AIRPORT (VVPQ)

AIRAC AIP SUP 19/24 REVISION OF AD OPERATING MINIMA AT DIEN BIEN AERODROME (VVDB)
AIP SUP 18/24

TEMPORARILY SUSPEND METEOROLOGICAL EQUIPMENT SYSTEM FOR REPAIR AT NOI BAI INTERNATIONAL AIRPORT (GEN)

AIP SUP 17/24

ADDITION OF CONTIGENCY PROCEDURES AT CAM RANH APP/TWR/GCU (VVCR)

AIRAC AIP SUP 16/24

ADJUSTMENT, ADDITION OF LIST OF AERODROME OBSTACLES IN AREA 2 AND AERODROME OBSTACLES CHARTS - ICAO - TYPE A AT DIEN BIEN AERODROME (VVDB) 

AIRAC AIP SUP 15/24

ADJUSTMENT, ADDITION OF LIST OF AERODROME OBSTACLES IN AREA 2 AND AERODROME OBSTACLES CHARTS - ICAO - TYPE A AT CAM RANH AERODROME (VVCR) 

AIP SUP 14/24

ADJUSTMENT AND ADDITION OF OPERATIONAL PROCEDURES OF TWO PARALLEL RUNWAYS AT NOI BAI INTERNATIONAL AIRPORT (VVNB) 

AIP SUP 13/24

CONSTRUCTION OF RUNWAY 35R/17L AT DA NANG INTERNATIONAL AIRPORT (VVDN)

AIP SUP 12/24

CONSTRUCTION OF EXTENDED SERVICE ROAD E6 AT TAN SON NHAT INTERNATIONAL AIRPORT (VVTS)

AIP SUP 11/24

PUT INTO OPERATION A PORTION OF THE EASTERN EXTENDED APRON T2 AT NOI BAI INTERNATIONAL AIRPORT (VVNB) 

AIP SUP 10/24

LIST OF ALTERNATE AERODROMES SERVING CIVIL AVIATION OPERATIONS (AD) 

AIP SUP 09/24

CONSTRUCTION OF TWY E1 AT PHU BAI INTERNATIONAL AIRPORT (VVPB)

AIP SUP 08/24

ADDITION OF ADDRESSING OF FLIGHT PLAN MESSAGES 

AIP SUP A04/24

CONSTRUCTION OF RUNWAY 02L/20R AT CAM RANH INTERNATIONAL AIRPORT

AIRAC AIP SUP A40/23 STANDARD AIRPORT TAXI ROUTES (SATR) OPEATIONAL PROCEDURES AT TAN SON NHAT INTERNATIONAL AIRPORT
AIP SUP A36/23
CONSTRUCTION OF TWY V AT NOI BAI INTERNATION AIRPORT

 

Recently invalid SUPs:

AIP SUP A07/24 PUTTING AREAS INTO OPERATION AFTER COMPLETING CONSTRUCTION AT DA NANG INTERNATIONAL AIRPORT
AIP SUP A06/24 OPERATIONAL PROCEDURE OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT TAN SON NHAT INTERNATIONAL AIRPORT
AIP SUP A05/24 OPERATIONAL PROCEDURE OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT NOI BAI INTERNATIONAL AIRPORT
AIP SUP A03/24 ADJUSTMENT AND ADDITION OF OPERATIONAL PROCEDURE OF TWO PARALLEL RUNWAYS AT NOI BAI INTERNATIONAL AIRPORT
AIP SUP A02/24 ADJUSTMENT AND ADDITION OF OPERATIONAL PROCEDURE OF TWO PARALLEL RUNWAYS AT TAN SON NHAT INTERNATIONAL AIRPORT
AIRAC AIP SUP A01/24 STANDARD TAXI ROUTES (STR) OPERATIONAL PROCEDURES AT NOI BAI INTERNATIONAL AIRPORT
AIP SUP A51/23 OPERATION OF SOME AREAS, CONTINUOUS CONSTRUCTION OF PHASE 1 STANDS 13, 14, 15; ADDITION OF STANDS 72A, 78A, 82A AT TAN SON NHAT INTERNATIONAL AIRPORT
AIRAC AIP SUP A50/23 ADJUSTMENT OF NO-PDC FLIGHT LEVELS IN RVSM AIRSPACE ON THE FOLLOWING ATS ROUTES WITHIN HA NOI AND HO CHI MINH FIRS 
AIP SUP A49/23

COORDINATES OF AIRCRAFT STANDS, OPERATIONAL PROCEDURES FOR AIRCRAFT STANDS AND AIRCRAFT OPERATIONAL PROCEDURES AFTER COMPLETION OF CONSTRUCTION AT PLEIKU AIRPORT 

AIP SUP A48/23

ADJUSTMENT OF CONTINGENCY PROCEDURES AT PHU QUOC TOWER

AIRAC AIP SUP A47/23 ESTABLISHMENT, ADJUSTMENT AND CANCELLATION OF EN-ROUTE HOLDINGS WITHIN HA NOI AND HO CHI MINH FIRS
AIP SUP A46/23 REVISION OF FLIGHT PROCEDURE CHARTS AND AERODROME OPERATING MINIMA AT DIEN BIEN AERODROME
AIRAC AIP SUP A45/23 REVISION OF FLIGHT PROCEDURE CHARTS AT TAN SON NHAT AERODROME
AIP SUP A43/23 REVISION OF ATS ROUTES PARAMETERS, AREA CHART, FLIGHT PROCEDURE CHARTS AND AERO-DROME OPERATING MINIMA AT DIEN BIEN AERO-DROME
AIRAC AIP SUP A42/23

PUT DIEN BIEN AIRPORT INTO OPERATION 

AIRAC AIP SUP A39/23

ESTABLISHMENT OF GROUND CONTROL UNIT (GCU) RESPONSIBILITY AREA AND ADJUSTMENT OF CONTROL AREA AT PHU QUOC AERODROME

AIRAC AIP SUP A37/23 RE-SECTORIZATION OF THE RESPONSIBILITY BOUNDARY OF SECTORS 3, 4 AND ESTABLISHMENT OF SECTOR 7 WITHIN HO CHI MINH ACC
AIRAC AIP SUP A29/23 PUTTING AREAS INTO OPERATION AFTER COMPLETING CONSTRUCTION AT TAN SON NHAT INTERNATIONAL AIRPORT
AIP SUP A23/23 ADJUSTMENT OF FRICTION COEFFICIENTS; COORDINATES OF AIRCRAFT 9H; AIRCRAFT OPERATIONAL PROCEDURES FOR COMMERCIAL AND ADDITION OF NEW HOT SPOT AT NOI BAI INTERNATIONAL AIRPORT
AIRAC AIP SUP A30/22 TEMPORARY PROCEDURE TO ENHANCE RUNWAY OPERATION CAPACITY AT TAN SON NHAT AERODROME
AIP SUP A39/22 CONSTRUCTIONS OF EXTENDED APRON AT NOI BAI INTERNATIONAL AIRPORT