Contact

Post:

Civil Aviation Authority of Viet Nam
Air Navigation Department
119 Nguyen Son Street,
Long Bien District
Ha Noi, Viet Nam

Telephone:  +84 24 38274191

Fax:  +84 24 38274194

Email:  and@caa.gov.vn

Web:  http://caa.gov.vn

AIP Supplement for VIET NAM

AIP SUP

14/25

Effective from 03 JUN 2025

to 15 JUL 2025

Published on 03 JUN 2025

  CONSTRUCTION OF PARALLEL TAXIWAY SP AT PHU BAI INTERNATIONAL AIRPORT (VVPB)

1 — INTRODUCTION

This section supplements the following portion(s) of the AIP: AD.

This AIP Supplement aims at notifying the construction of parallel TWY SP at Phu Bai international airport (VVPB).

NOTAMs A1562/25, A1563/25, A1564/25 have been published to notify this contents.

2 — DETAILS

2.1  Construction area

Construction and repair of 49 cement concrete slabs on parallel TWY SP (The parallel TWY SP, adjacent to the apron and including stands from 1 to 5) to a position 36 M from the CL of TWY E1 to the North.

Note:

  1. Construction areas are surrounded by fences, NO ENTRY marker boards, warning lights, markings as prescribed.

  2. Pilot shall follow ATC instructions strictly.

2.2  Construction period: H24, Until 1659 on 15 JUL 2025

2.3  Temporarily closed areas

  1. Stands 1, 2, 3, 4, 5.

  2. TWY W1.

  3. Parallel TWY SP (The portion from stand 1 to 5).

  4. Turning off/Covering the lighting system and marker boards on TWY W1.

2.4  Aircraft operational procedures during the construction period

  1. For landing aircraft

    1. RWY 09 → the beginning of RWY 27 to backtrack → TWY E1 → taxilane D1 (or taxilane D1→ taxilane D) → apron (stands 6, 6A, 6B, 7, 8, 9, 10, 11, 12).

    2. RWY 27 → the beginning of RWY 09 to backtrack → TWY E1 → taxilane D1 (or taxilane D1→ taxilane D) → apron (stands 6, 6A, 6B, 7, 8, 9, 10, 11, 12).

  2. For take-off aircraft

    Aircraft at stands 6, 6A, 6B, 7, 8, 9, 10, 11, 12 are pushed back to taxilane D, the nose of the aircraft face West. Aircraft are started up via taxilane D → taxilane D1 → TWY E1 → the beginning of the RWY and backtrack for departure.

3 — EFFECT

This AIP Supplement shall become effective until 1659 on 15 JUL 2025.

4 — CANCELLATION

This AIP Supplement supersedes NOTAMs: A1562/25, A1563/25, A1564/25.

Any change relating to this AIP Supplement shall be notified by NOTAM.

This AIP Supplement consists of 1 attachment as follows:

Layout of Aircraft Parking/Docking during construction area until 1959 on 15 JUL 2025

Figure 1. LAYOUT OF AIRCRAFT PARKING/DOCKING DURING CONSTRUCTION AREA UNTIL 1659 ON 15 JUL 2025 (UTC)
../graphics/167770