GEN 3.2  AERONAUTICAL CHARTS

1  Responsible services

1.1   The Civil Aviation Authority of Viet Nam organizes the development, promulgation and publishing of aeronautical charts for use by all types of civil aviation.
Post:

Air Navigation Department
Civil Aviation Authority of Viet Nam (CAAV)
119 Nguyen Son Street, Long Bien District
Ha Noi 10 000, Viet Nam

Telephone:   +84 24 38274191; +84 24 38723600

Fax:   +84 24 38274194

AFS:  NIL

Email:   and@caa.gov.vn

URL:   http://caa.gov.vn

1.2  The Viet Nam Aeronautical Information Centre - VATM produces the aeronautical charts which are part of the AIP.

Other aeronautical charts are produced by the Viet Nam General Department of Land Administration. The charts published in the AIP are produced in accordance with the provisions contained in ICAO Annex 4 – Aeronautical Charts. The differences to these provisions are detailed in subsection GEN 1.7.

Division of Flight Procedure Design and Cartography

Post:

Viet Nam Aeronautical Information Centre (VNAIC)
Viet Nam Air Traffic Management Corporation (VATM)
No. 200 / 5 Nguyen Son Street, Long Bien District
Ha Noi 10 000, Viet Nam

Telephone:   +84 24 38729581 +84 24 38271513 ext: 8660 +84 24 38271514 ext: 8660

Fax:   +84 24 38728781

AFS:   VVVVYOYM

Email:   mappro@vnaic.vn

2  Maintenance of charts

2.1  The aeronautical charts included in the AIP are kept up to date by means of sheet replacement where necessary. Significant amendments or revisions of aeronautical information for other aeronautical charts are also included in the replacement sheets. Amended or revised information on aeronautical charts is normally printed and published when permitted. The aeronautical charts included in the AIP are kept up to date by supplements or amendments to the AIP. Information concerning the planning for or issuance of new maps and charts is notified by AIC.
2.2  If incorrect information detected on published chart is of operational significance, it is corrected by NOTAM. If incorrect information detected on published chart is of operational significance, it is corrected by NOTAM.

3  Purchase arrangements

3.1 The charts as listed under in AIP of this subsection may be obtained from:
Post:

AIP Division
Viet Nam Aeronautical Information Centre (VNAIC)
Viet Nam Air Traffic Management Corporation (VATM)
No. 200/5 Nguyen Son Street, Long Bien District
Ha Noi 10 000, Viet Nam

Telephone:  +84 24 38728521; +84 24 38271513;
+84 24 38271514 ext: 8416

Fax:  +84 24 38725687

AFS:  VVVVYOYP

Email:  aip@vnaic.vn

4  Aeronautical chart series available

4.1 The following series of aeronautical charts are produced:
  1. Aeronautical Chart 1:1 000 000 (WGS-84);

  2. Aerodrome Chart/Heliport Chart – ICAO;

  3. Aircraft parking/Docking Chart – ICAO;

  4. Aerodrome Ground Movement Chart – ICAO;

  5. Aerodrome Obstacle Chart – ICAO Type A;

  6. Aerodrome Obstacle Chart – ICAO Type B;

  7. Precision Approach Terrain Chart – ICAO

  8. En-route Chart – ICAO;

  9. Area Chart – ICAO;

  10. Standard Departure Chart – Instrument (SID) – ICAO;

  11. Standard Arrival Chart – Instrument (STAR) – ICAO

  12. Instrument Approach Chart – ICAO;

  13. Visual Approach Chart – ICAO;

  14. ATC Surveillance Minimum Altitude Chart – ICAO.

The charts currently available are listed under item 5 of this subsection.

4.2 General descriptions of each chart
  1. Aeronautical Chart 1:1 000 000 (WGS-84)

    This series chart is constructed on “Gauss” projection between 10000E to 11800E and 0440N to 2350N with the scale of 1:1 000 000. The aeronautical data shown have been kept to a minimum, consistent with the use of the chart for visual air navigation. It concludes a selection of aerodrome, significant obstacles. The chart provides information to satisfy visual air navigation and is also used as a pre-flight planning chart.

  2. Aerodrome/Heliport Chart – ICAO

    This chart contains detailed aerodrome/heliport data to provide flight crews with information to facilitate the ground movement of aircraft:

    1. From the aircraft stand to the runway; and

    2. From the runway to the aircraft stand.

    It also provides essential operational information at HAI PHONG/Cat Bi; KHANH HOA/Cam Ranh; CAN THO/Can Tho; DA NANG/Da Nang; HA NOI/Noi Bai; HUE/Phu Bai; KIEN GIANG/Phu Quoc; HO CHI MINH/Tan Son Nhat and QUANG NINH/Van Don INTL Aerodromes.This chart also provides essential operational information at aerodromes/heliports.

  3. Aircraft Parking/Docking Chart – ICAO

    This chart is produced for those aerodromes where, due to the complexity of the terminal facilities, the information to facilitate the ground movement of aircraft between the taxiways and the aircraft stands and the parking/docking of aircraft can not be shown with sufficient clarity on the Aerodrome/Heliport Chart –ICAO or on the Aerodrome Ground Movement Chart – ICAO.

  4. Aerodrome Ground Movement Chart – ICAO

    This supplementary chart shall provide flight crews with detailed information to facilitate the ground movement of aircraft to and from the aircraft stands and the parking/docking of aircraft.This chart is produced for those aerodromes where, due to congestion of information, details necessary for the ground movement of aircraft along the taxiways to and from the aircraft stands, and for the parking/docking of aircraft, cannot be shown with sufficient clarity on the Aerodrome/Heliport Chart — ICAO.

  5. Aerodrome Obstacle Chart – ICAO type A (operating limitations)

    This chart contains detailed information on obstacles in the take-off flight path areas of DA NANG/Da Nang, HA NOI/Noi Bai, HUE/PHU BAI and HO CHI MINH/Tan Son Nhat Airports. It is shown in plan and profile view. And provides the data necessary to enable an operator to comply with the operating limitations of ICAO Annex 6, Parts I and II, Chapter V.This chart contains detailed information on obstacles in the take-off flight path areas of aerodromes. It is shown in plan and profile view. This obstacle information provides the data necessary to enable an operator to comply with the operating limitations of ICAO Annex 6, Part I, Chapter 5; and Part II, Section 2, Chapter 2.3.

  6. Aerodrome Obstacle Chart – ICAO type B

    This chart shall provide information to satisfy the following functions:

    1. the determination of minimum safe altitudes/heights including those for circling procedures;

    2. the determination of procedures for use in the event of an emergency during take-off or landing;

    3. the application of obstacle clearing and marking criteria; and

    4. the provision of source material for aeronautical charts.

  7. Precision Approach Terrain Chart – ICAO

    This chart shall provide detailed terrain profile information within a defined portion of the final approach so as to enable aircraft operating agencies to assess the effect of the terrain on decision height determination by the use of radio altimeters. This chart is produced for all CAT II Precision Approach RWY at Noi Bai AirportCat II and III runways.

  8. En-route Chart – ICAO

    This chart is produced for the entire Ha Noi and Ho Chi Minh FIRs of Viet Nam. The aeronautical data include all aerodromes, prohibited, restricted and danger areas and the Air Traffic services system in details. This chart provides the flight crew with information to facilitate navigation along ATS routes in compliance with air traffic services procedures.

  9. Area Chart - ICAO

    This chart is produced when the Air Traffic Services routes or position reporting requirements are complex and can not be shown on the En-route Chart - ICAO. It shows, in more details, those aerodromes that affect terminal routings, prohibited, restricted and danger areas, and the air traffic services system. This chart provides the flight crew with information to facilitate the various phases of instrument flight:

    1. The transition between the en-route phase and the approach to an aerodrome;

    2. The transition between the take-off/missed approach and the en-route phase of flight; and

    3. Flights through areas of complex ATS routes or airspace structure.

  10. Standard Departure Chart – Instrument (SID) – ICAO

    This chart is produced whenever a standard departure route – instrument has been established and can not be shown with sufficient clarify on the Area Chart – ICAO.

    The aeronautical data shown include the aerodrome of departure, aerodrome(s) the locations of which affect the designated standard departure route – instrument, prohibited, restricted and danger areas and the Air Traffic services system. This chart provides the flight crew with information that will enable them to comply with the designated standard departure route – instrument from the take-off phase to the en-route phase.

  11. Standard Arrival Chart – Instrument (STAR) – ICAO

    This chart is produced whenever a standard arrival route – instrument has been established and can not be shown with sufficient clarify on the Area Chart – ICAO. The aeronautical data shown includes the aerodrome of landing, aerodrome(s) which affect the designated standard arrival route instrument, prohibited, restricted and danger areas and the Air Traffic services system. This chart provides the flight crew with information that will enable them to comply with the designated standard arrival route – instrument from the en-route phase to the approach phase.

    The aeronautical data shown includes the aerodrome of landing, aerodrome(s) which affect the designated standard arrival route instrument, prohibited, restricted and danger areas and the Air Traffic services system. This chart provides the flight crew with information that will enable them to comply with the designated standard arrival route – instrument from the en-route phase to the approach phase.

  12. Instrument Approach Chart – ICAO

    This chart is produced for all aerodromes used by civil aviation where instrument approach procedures have been established. A separate Instrument Approach Chart – ICAO has been provided for each approach procedure.

    The aeronautical data shown include information on aerodromes, prohibited, restricted and danger areas, radio communication facilities and navigation aids, minimum sector altitude, procedure track portrayed in plan and profile view, aerodrome operating minima, etc.

    The aeronautical data shown include information on aerodromes, obstacles, designated airspace, visual approach information, radio navigation aid and communication facilities, as appropriate.This chart provides the flight crew with information that will enable them to perform an approved instrument approach procedure to the runway of intended landing including the missed approach procedure and, where applicable, associated holding patterns.

  13. Visual Approach Chart – ICAO

    This chart is produced for aerodromes used by civil aviation where:

    1. Only limited navigation facilities are available; or

    2. Radio communication facilities are not available; or

    3. No adequate aeronautical charts of the aerodrome and its surrounding at 1:500 000 or greater scale are available; or

    4. Visual approach procedures have been established.

    The aeronautical data shown include information on aerodromes, obstacles, designated airspace, visual approach information, radio navigation aid and communication facilities, as appropriate.

  14. ATC Surveillance Minimum Altitude Chart – ICAO

    This supplementary chart shall provide information that will enable flight crews to monitor and cross-check altitudes assigned by a controller using an ATS surveillance system.

5  Topographical Charts

To supplement the aeronautical charts, a wide range of topographical charts is available from:

Post:

Viet Nam General Department of Land Administration
Cartographic Publishing House
73 Nguyen Chi Thanh street
Ha Noi, Viet Nam

Telephone:   +84 24 38343812; +84 24 38344168

Fax:   +84 24 38344610

Title of series

Scale

Name and/or number

Price

Date

Aeronautical chart

1:1 000 000N - 1 Ha Noi 1988
N - 2 Hai Phong 1988
 N - 3 Quang Chau 1988
 N - 4 Vinh 1988
 N - 5 Hue 1988
 N - 6 Da Bong Bay 1988
 N - 7 Can Tho 1988
 N - 8 Ho Chi Minh 1988
 N - 9 Truong Sa 1988
 N - 10 Ca Mau 1988
 N - 11 Con Dao 1988
 N - 12 An Bang Island 1988
 1:500 000F-48-A Lao Cai 1997
 F-48-B Cao Bang 1997
 F-48-C Dien Bien 1997
 F-48-D Ha Noi 1997
 E-48-A Luangprabang 1997
 E-48-B Vinh 1997
 E-48-C Vien Chan 1997
 E-48-D Hue 1997
 E-49-C Da Nang 1997
 D-48-B Attapu 1997
 D-49-B Quang Ngai 1997
 D-49-D Stung To Treng 1997
 D-49-C Qui Nhon 1997
 C-48-A Phnom Penh 1997
 C-48-B Ho Chi Minh 1997
 C-49-A Da Lat 1997
 C-48-C Ca Mau 1997
 C-48-D Tra Vinh 1997
 C-49-C Hon Hai 1997
 1:250 000F-48-13 Dong Van 1988
 F-48-12 Lai Chau 1988
 F-48-11 Lao Cai 1988
 F-48-10 Cao Bang 1988
 F-48-9 Long Chau 1988
 F-48-8 Dien Bien 1988
  F-48-7 Yen Bai 1988
 F-48-6 Ha Noi 1988
 F-48-5 Mong Cai 1988
 F-48-4 Muong Ngoi 1988
 F-48-3 Sam Nua 1988
 F-48-2 Nam Dinh 1988
 F-48-1 Hai Phong 1988
 E-48-7 Cua Rao 1988
 E-48-6 Thanh Hoa 1988
 E-48-5 Pac San 1988
 E-48-4 Vinh 1988
 E-48-3 Ba Don 1988
 E-48-2 Dong Hoi 1988
 E-48-1 Hue 1988
 D-49-5 Da Nang 1988
 D-48-5 Pakglei (Kham Duc) 1988
 D-49-4 Hoi An (Quang Ngai) 1988
 D-48-3 Attapu 1988
 D-49-3 Kon Tum 1988
 D-48-2 Pleiku 1988
 D-49-2 Qui Nhon 1988
 D-48-1 Dac Min 1988
 D-49-1 Nha Trang 1988
 C-48-9 Tay Ninh 1988
 C-48-8 Bao Loc 1988
 C-49-1 Da Lat 1988
 C-48-7 Phu Quoc 1988
 C-48-6 Long Xuyen 1988
 C-48-5 Ho Chi Minh 1988
 C-48, 49-4 Phan Thiet 1988
 C-48-3 Ca Mau 1988
 C-48-2 Tra Vinh 1988
 C-48-1 Nam Can 1988

Title of series

Scale

Name and/or number

Price

Date

Aerodrome Chart (ADC) – ICAO

  BUON MA THUOT/Buon Ma Thuot   
1:30 000AD 2-VVBM-2-1 

08 AUG 2024

  QUANG NAM/Chu Lai   
 1:30 000AD 2-VVCA-2-1 

31 OCT 2024

   HAI PHONG/Cat Bi   
 1:30 000AD 2-VVCI-2-1 13 JUN 2024
   CA MAU/Ca Mau   
 1:15 000AD 2-VVCM-2-1 

08 AUG 2024

   KHANH HOA/Cam Ranh   
 1:30 000AD 2-VVCR-2-1 13 JUN 2024
   BA RIA - VUNG TAU/Con Dao   
 1:30 000AD 2-VVCS-2-1 

08 AUG 2024

   CAN THO/Can Tho   
 Not to scaleAD 2-VVCT-2-1  31 OCT 2024
   DIEN BIEN/Dien Bien   
 1:20 000AD 2-VVDB-2-1 

13 JUN 2024

   QUANG BINH/Dong Hoi   
 1:25 000AD 2-VVDH-2-1 03 OCT 2024
   DA LAT/Lien Khuong   
 1:30 000AD 2-VVDL-2-1 13 JUN 2024
   DA NANG/Da Nang   
 1:30 000AD 2-VVDN-2-1 03 OCT 2024
   HA NOI/Noi Bai   
 1:30 000AD 2-VVNB-2-1 

08 AUG 2024

   HUE/Phu Bai   
 Not to scaleAD 2-VVPB-2-1 

08 AUG 2024

   BINH DINH/Phu Cat   
 1:30 000AD 2-VVPC-2-1 

08 AUG 2024

   GIA LAI/Pleiku   
 1:20 000AD 2-VVPK-2-1 

08 AUG 2024

   KIEN GIANG/Phu Quoc   
 1:30 000AD 2-VVPQ-2-1 13 JUN 2024
   KIEN GIANG/Rach Gia   
 1:15 000AD 2-VVRG-2-1 

08 AUG 2024

   PHU YEN/Tuy Hoa   
 1:30 000AD 2-VVTH-2-1 

05 SEP 2024

   HO CHI MINH/Tan Son Nhat   
 Not to scaleAD 2-VVTS-2-1 13 JUN 2024
   THANH HOA/Tho Xuan   
 1:30 000AD 2-VVTX-2-1 

08 AUG 2024

   VAN DON/Quang Ninh   
 Not to scaleAD 2-VVVD-2-1 

13 JUN 2024

   NGHE AN/Vinh   
 1:25 000AD 2-VVVH-2-1 

08 AUG 2024

Title of series

Scale

Name and/or number

Price

Date

Aircraft Parking/ Docking Chart – ICAO (APDC)

  BUON MA THUOT/Buon Ma Thuot   
1:35 000AD 2-VVBM-4-1 

08 AUG 2024

  QUANG NAM/Chu Lai   
 1:5 000AD 2-VVCA-4-1 

31 OCT 2024

   HAI PHONG/Cat Bi   
 1:5 000AD 2-VVCI-4-1 13 JUN 2024
   CA MAU/Ca Mau   
 1:2 000AD 2-VVCM-4-1 

08 AUG 2024

   KHANH HOA/Cam Ranh   
 Not to scaleAD 2-VVCR-4-1 

18 APR 2024

   BA RIA - VUNG TAU/Con Dao   
 1:3 500AD 2-VVCS-4-1 

08 AUG 2024

   CAN THO/Can Tho   
 Not to scaleAD 2-VVCT-4-1 

13 JUN 2024

   DIEN BIEN/Dien Bien   
 1:2 500AD 2-VVDB-4-1 

08 AUG 2024

   QUANG BINH/Dong Hoi   
 1:2 500AD 2-VVDH-4-1 

15 JUL 2023

   DA LAT/Lien Khuong   
 Not to scaleAD 2-VVDL-4-1 

13 JUN 2024

   DA NANG/Da Nang   
 Not to scaleAD 2-VVDN-4-1 03 OCT 2024
   HA NOI/Noi Bai   
 Not to scaleAD 2-VVNB-4-1 

08 AUG 2024

   HUE/Phu Bai   
 1:4 500AD 2-VVPB-4-1 

08 AUG 2024

   BINH DINH/Phu Cat   
 1:3 500AD 2-VVPC-4-1 

08 AUG 2024

   GIA LAI/Pleiku   
 1:2 500AD 2-VVPK-4-1 

22 FEB 2024

   KIEN GIANG/Phu Quoc   
 Not to scaleAD 2-VVPQ-4-1 13 JUN 2024
   KIEN GIANG/Rach Gia   
 1:2 000AD 2-VVRG-4-1 

31 OCT 2023

   PHU YEN/Tuy Hoa   
 1:4 000AD 2-VVTH-4-1 

08 AUG 2024

   HO CHI MINH/Tan Son Nhat   
 Not to scaleAD 2-VVTS-4-1 13 JUN 2024
   THANH HOA/Tho Xuan   
 1:3 500AD 2-VVTX-4-1 

15 JUL 2023

   VAN DON/Quang Ninh   
 Not to scaleAD 2-VVVD-4-1 

15 JUL 2023

   NGHE AN/Vinh   
 1:2 500AD 2-VVVH-4-1 

08 AUG 2024

Title of series

Scale

Name and/or number

Price

Date

Aerodrome Ground Movement Chart – ICAO (GMC)

  BUON MA THUOT/Buon Ma Thuot   
1:15 000AD 2-VVBM-5-1 

08 AUG 2024

  QUANG NAM/Chu Lai   
 1:20 000AD 2-VVCA-5-1 

31 OCT 2024

   HAI PHONG/Cat Bi   
 1:15 000AD 2-VVCI-5-1 

13 JUN 2024

   CA MAU/Ca Mau   
 1:8 000AD 2-VVCM-5-1 

08 AUG 2024

   KHANH HOA/Cam Ranh   
 Not to scaleAD 2-VVCR-5-1 18 APR 2024
   BA RIA - VUNG TAU/Con Dao   
 1:10 000AD 2-VVCS-5-1 

08 AUG 2024

   CAN THO/Can Tho   
 Not to scaleAD 2-VVCT-5-1 

13 JUN 2024

   DIEN BIEN/Dien Bien   
 1:10 000AD 2-VVDB-5-1 

22 FEB 2024

   QUANG BINH/Dong Hoi   
 1:13 000AD 2-VVDH-5-1 

15 JUL 2023

   DA LAT/Lien Khuong   
 1:15 000AD 2-VVDL-5-1 13 JUN 2024
   DA NANG/Da Nang   
 Not to scaleAD 2-VVDN-5-1 03 OCT 2024
   HA NOI/Noi Bai   
 Not to scaleAD 2-VVNB-5-1 

08 AUG 2024

   HUE/Phu Bai   
 1:15 000AD 2-VVPB-5-1 

08 AUG 2024

   BINH DINH/Phu Cat   
 1:17 000AD 2-VVPC-5-1 

08 AUG 2024

   GIA LAI/Pleiku   
 1:15 000AD 2-VVPK-5-1 

15 JUL 2023

   KIEN GIANG/Phu Quoc   
 Not to scaleAD 2-VVPQ-5-1 

13 JUN 2024

   KIEN GIANG/Rach Gia   
 1:8 000AD 2-VVRG-5-1 

22 FEB 2024

   PHU YEN/Tuy Hoa   
 1:20 000AD 2-VVTH-5-1 

08 AUG 2024

   HO CHI MINH/Tan Son Nhat   
 Not to scaleAD 2-VVTS-5-1 13 JUN 2024
   THANH HOA/Tho Xuan   
 1:17 000AD 2-VVTX-5-1 

08 AUG 2024

   VAN DON/Quang Ninh   
 Not to scaleAD 2-VVVD-5-1 

15 JUL 2023

   NGHE AN/Vinh   
 1:13 000AD 2-VVVH-5-1 

08 AUG 2024

Title of series

Scale

Name and/or number

Price

Date

Aerodrome Obstacle Chart – ICAO, Type A (AOC/A)

  HAI PHONG/Cat Bi   

1:20 000

(Horizontal Scale)

AD 2-VVCI-6-1 13 JUN 2024

1:2 000

(Vertical Scale)

 
   KHANH HOA/Cam Ranh   

 

1:20 000

(Horizontal Scale)

AD 2-VVCR-6-1 

08 AUG 2024

 

1:2 000

(Vertical Scale)

 

 

1:20 000

(Horizontal Scale)

AD 2-VVCR-6-3 

08 AUG 2024

 

1:2 000

(Vertical Scale)

 
   CAN THO/Can Tho   
 

1:20 000

(Horizontal Scale)

AD 2-VVCT-6-1 

13 JUN 2024

 

1:2 000

(Vertical Scale)

 
   QUANG BINH/Dong Hoi   
 

1:20 000

(Horizontal Scale)

AD 2-VVDH-6-1 

15 JUL 2023

 

1:2 000

(Vertical Scale)

 
   DA LAT/Lien Khuong   
 

1:20 000

(Horizontal Scale)

AD 2-VVDL-6-1 

13 JUN 2024

 

1:2 000

(Vertical Scale)

 
  DIEN BIEN/Dien Bien  
 

1:20 000

(Horizontal Scale)

AD 2-VVDB-6-1 

08 AUG 2024

 

1:20 000

(Horizontal Scale)

 
   DA NANG/Da Nang   

 

1:20 000

(Horizontal Scale)

AD 2-VVDN-6-1 

15 JUL 2023

 

1:2 000

(Vertical Scale)

 

 

1:20 000

(Horizontal Scale)

AD 2-VVDN-6-3 

15 JUL 2023

 

1:2 000

(Vertical Scale)

 
   HA NOI/Noi Bai   

 

1:20 000

(Horizontal Scale)

AD 2-VVNB-6-1 

15 JUL 2023

 

1:2 000

(Vertical Scale)

 

 

1:20 000

(Horizontal Scale)

AD 2-VVNB-6-3 

15 JUL 2023

 

1:2 000

(Vertical Scale)

 
   HUE/Phu Bai   
 

1:20 000

(Horizontal Scale)

AD 2-VVPB-6-1 

15 JUL 2023

 

1:2 000

(Vertical Scale)

 
   BINH DINH/Phu Cat   
 

1:20 000

(Horizontal Scale)

AD 2-VVPC-6-1 

15 JUL 2023

 

1:2 000

(Vertical Scale)

 
   GIA LAI/Pleiku   
 

1:20 000

(Horizontal Scale)

AD 2-VVPK-6-1 

15 JUL 2023

 

1:2 000

(Vertical Scale)

 
   KIEN GIANG/Phu Quoc   
 

1:20 000

(Horizontal Scale)

AD 2-VVPQ-6-1 

15 JUL 2023

 

1:2 000

(Vertical Scale)

 
   PHU YEN/Tuy Hoa   
 

1:15 000

(Horizontal Scale)

AD 2-VVTH-6-1 

23 JAN 2025

 

1:1 500

(Vertical Scale)

   
   HO CHI MINH/Tan Son Nhat   

 

1:20 000

(Horizontal Scale)

AD 2-VVTS-6-1 

15 JUL 2023

 

1:2 000

(Vertical Scale)

 
 

1:20 000

(Horizontal Scale)

AD 2-VVTS-6-3 

15 JUL 2023

 

1:2 000

(Vertical Scale)

 
   VAN DON/Quang Ninh   
 

1:20 000

(Horizontal Scale)

AD 2-VVVD-6-1 

15 JUL 2023

 

1:2 000

(Vertical Scale)

 
   NGHE AN/Vinh   
 

1:20 000

(Horizontal Scale)

AD 2-VVVH-6-1 

15 JUL 2023

 

1:2 000

(Vertical Scale)

 

Title of series

Scale

Name and/or number

Price

Date

Aerodrome Obstacle Chart – ICAO, Type B (AOC/B)

  HAI PHONG/Cat Bi   

1:20 000

(Horizontal Scale)

AD 2-VVCI-6-5 

15 JUL 2023

   DA NANG/Da Nang   
 

1:20 000

(Horizontal Scale)

AD 2-VVDN-6-5 

15 JUL 2023

   HA NOI/Noi Bai   
 

1:20 000

(Horizontal Scale)

AD 2-VVNB-6-5 

15 JUL 2023

   HO CHI MINH/Tan Son Nhat   
 

1:20 000

(Horizontal Scale)

AD 2-VVTS-6-5 

15 JUL 2023

Title of series

Scale

Name and/or number

Price

Date

   QUANG BINH/Dong Hoi   

Precision Approach Terrain Chart (PATC) – ICAO

1:2 500

(Horizontal Scale)

AD 2-VVDH-7-1 

15 JUL 2023

1:1 500

(Vertical Scale)

   HA NOI/Noi Bai   
 

1:2 500

(Horizontal Scale)

AD 2-VVNB-7-1 

15 JUL 2023

 

1:500

(Vertical Scale)

Title of series

Scale

Name and/or number

Price

Date

Area Chart (ARC) – ICAO

  BUON MA THUOT/Buon Ma Thuot   
1:500 000AD 2-VVBM-8-1 

15 JUL 2023

  QUANG NAM/Chu Lai   
 1:500 000AD 2-VVCA-8-1 

15 JUL 2023

   HAI PHONG/Cat Bi   
 1:500 000AD 2-VVCI-8-1 

15 JUL 2023

   CA MAU/Ca Mau   
 1:500 000AD 2-VVCM-8-1 

15 JUL 2023

   KHANH HOA/Cam Ranh   
 1:1 200 000AD 2-VVCR-8-1 

15 JUL 2023

   BA RIA - VUNG TAU/Con Dao   
 1:500 000AD 2-VVCS-8-1 

15 JUL 2023

   CAN THO/Can Tho   
 1:500 000AD 2-VVCT-8-1 

15 JUL 2023

   DIEN BIEN/Dien Bien   
 1:500 000AD 2-VVDB-8-1 

22 FEB 2024

   QUANG BINH/Dong Hoi   
 1:1 000 000AD 2-VVDH-8-1 

15 JUL 2023

   DA LAT/Lien Khuong   
 1:500 000AD 2-VVDL-8-1 

13 JUN 2024

   DA NANG/Da Nang   
 1:1 000 000AD 2-VVDN-8-1 

15 JUL 2023

   HA NOI/Noi Bai   
 Not to scaleAD 2-VVNB-8-1  20 MAR 2025

15 JUL 2023

   HUE/Phu Bai   
 1:500 000AD 2-VVPB-8-1 

15 JUL 2023

   BINH DINH/Phu Cat   
 1:1 000 000AD 2-VVPC-8-1 

15 JUL 2023

   GIA LAI/Pleiku   
 1:1 000 000AD 2-VVPK-8-1 

15 JUL 2023 20 MAR 2025

   KIEN GIANG/Phu Quoc   
 1:500 000AD 2-VVPQ-8-1 

15 JUL 2023

   KIEN GIANG/Rach Gia   
 1:500 000AD 2-VVRG-8-1 

15 JUL 2023

   PHU YEN/Tuy Hoa   
 1:500 000AD 2-VVTH-8-1 

31 AUG 2023

   HO CHI MINH/Tan Son Nhat   
 1:1 200 000AD 2-VVTS-8-1 

15 JUL 2023

   THANH HOA/Tho Xuan   
 1:500 000 AD 2-VVTX-8-1 

15 JUL 2023

   VAN DON/Quang Ninh   
 Not to scaleAD 2-VVVD-8-1 

15 JUL 2023

   NGHE AN/Vinh   
 1:500 000 AD 2-VVVH-8-1 

15 JUL 2023

Chart for delegated airspace of Ha NoiACC to Cat Bi TWR

  HAI PHONG/Cat Bi   
1:1 300 000AD 2-VVCI-8-3 

15 JUL 2023

Chart for delegated airspace of Ha Noi ACC to Tho Xuan TWR

  THANH HOA/Tho Xuan   
1:1 100 000AD 2-VVTX-8-3 

15 JUL 2023

Chart of delegated airspace of Ha Noi ACC to Vinh TWR

  NGHE AN/Vinh   
1:1 100 000AD 2-VVVH-8-3 

15 JUL 2023

Title of series

Scale

Name and/or number

Price

Date

Standard Departure Chart Instrument (SID) – ICAO

  BUON MA THUOT/Buon Ma Thuot   
1:500 000AD 2-VVBM-9-1 RWY 09: MEVON 1A, ENGIM 1A, NOBID 1A, ONEBI 2A, DOVIN1A, ENRIN 1A, PATMA 1A 

15 JUL 2023

 1:500 000AD 2-VVBM-9-3 RNP RWY 09: MEVON 2E, ENGIM 2E, NOBID 2E, ONEBI 3E, DOVIN 2E, ENRIN 2E 

15 JUL 2023

 1:500 000AD 2-VVBM-9-9 RWY 27: MEVON 1B, ENGIM 1B, NOBID 1B, ONEBI 2B, DOVIN 1B, ENRIN 1B, PATMA 1B 

15 JUL 2023

 1:500 000AD 2-VVBM-9-11 RNP RWY 27: MEVON 2F, ENGIM 2F, NOBID 2F, ONEBI 3F, DOVIN 2F, ENRIN 2F 

15 JUL 2023

   QUANG NAM/Chu Lai   
 1:450 000AD 2-VVCA-9-1 RWY 14: DAN 1C, BANSU 1A, KUMUN 1K 

15 JUL 2023

 1:600 000AD 2-VVCA-9-3 RNP RWY 14: DAN 1D, BANSU 1D, KUMUN 1N 

15 JUL 2023

 1:450 000AD 2-VVCA-9-7 RWY 32: DAN 1H 

15 JUL 2023

 1:450 000AD 2-VVCA-9-9 RWY 32: BANSU 1B, KUMUN 1L 

15 JUL 2023

 1:500 000AD 2-VVCA-9-11 RNP RWY 32: DAN 1E, BANSU 1E, KUMUN 1P 

15 JUL 2023

   HAI PHONG/Cat Bi   
 1:500 000AD 2-VVCI-9-1 RWY 07: PHUTA 1A, VIBAO 1A, VANUC 1A, LOCHA 1A 

15 JUL 2023

 1:500 000AD 2-VVCI-9-3 RWY 25: VIBAO 1B, VANUC 1B, PHUTA 1B, LOCHA 1B 

15 JUL 2023

 1:500 000AD 2-VVCI-9-5 RWY 07: TUCHA 1A 

15 JUL 2023

 1:500 000AD 2-VVCI-9-7 RWY 25: TUCHA 1B 

15 JUL 2023

 1:500 000AD 2-VVCI-9-9 RNAV RWY 07: TUCHA 1C 

15 JUL 2023

 1:500 000AD 2-VVCI-9-11 RNAV RWY 25: TUCHA 1D 

15 JUL 2023

 1:500 000AD 2-VVCI-9-13 RNAV RWY 07: LOCHA 1C 

15 JUL 2023

 1:500 000AD 2-VVCI-9-15 RNAV RWY 07: GASSO 1A, PHUTA 1C, VIBAO 1C, VIBAO 1D 

15 JUL 2023

 1:500 000AD 2-VVCI-9-19 RNAV RWY 25: ADMAM 1A, DOKLA 1A, VANUC 1C, VIBAO 1E 

15 JUL 2023

   CA MAU/Ca Mau   
 1:250 000AD 2-VVCM-9-1 RWY 09/27: TRN 1A, TRN 1B 

15 JUL 2023

 1:250 000AD 2-VVCM-9-3 RNP RWY 09/27: TRN 1N (RWY 09), TRN 1P (RWY 27) 30 OCT 2023
   KHANH HOA/Cam Ranh   
 1:500 000AD 2-VVCR-9-1 RWY 02L/R: NITOM 1A, PTH 1A, DALAT 1A, KARAN 1A, KARAN 1B 

15 JUL 2023

 1:500 000AD 2-VVCR-9-3 RWY 20L/R: NITOM 1B, PTH 1B, DALAT 1B, KARAN 1C 

15 JUL 2023

 1:750 000AD 2-VVCR-9-5 RNP RWY 02L/R: FURAL 1A, NIHOA 1A, PANLU 1A, THAKA 1A 

15 JUL 2023

 1:750 000AD 2-VVCR-9-9 RNP RWY 20L/R: ANKIN 1B, BANKE 1B, KOPOM 1A, NIHOA 1B, SOTEN 1B 

15 JUL 2023

   BA RIA - VUNG TAU/Con Dao   
 1:500 000AD 2-VVCS-9-1 RWY 11: NIXIV 1A, VEPKI 1A 

15 JUL 2023

 1:500 000AD 2-VVCS-9-3 RWY 11: NIXIV 1H, VEPKI 1H CAT A, B 

15 JUL 2023

 1:500 000AD 2-VVCS-9-5 RNP RWY 11: BODOD 1D, NIXIV1D, VEPKI 1D 

15 JUL 2023

 1:500 000AD 2-VVCS-9-9 RNP RWY 11: NIXIV 1J, VEPKI 1N 

15 JUL 2023

 1:500 000AD 2-VVCS-9-13 RWY 29: NIXIV 1B, VEPKI 1B 

15 JUL 2023

 1:500 000AD 2-VVCS-9-15 RNP RWY 29: BODOD 1E, NIXIV 1E, VEPKI 1E 

15 JUL 2023

   CAN THO/Can Tho   
 1:500 000AD 2-VVCT-9-1 RWY 06: DOTHA 4C, CHUTA 4C, CANTO 3C, VINLO 3C, XUTHO 3C, ANHOA 2C 

15 JUL 2023

 1:500 000AD 2-VVCT-9-3 RWY 24: DOTHA 4D, CHUTA 4D, CANTO 3D, VINLO 3D, XUTHO 4D, ANHOA 2D 

15 JUL 2023

 1:500 000AD 2-VVCT-9-5 RNP RWY 06: MOXEB 1E, ENPAS 1A 

15 JUL 2023

 1:500 000AD 2-VVCT-9-7 RNP RWY 06: RG 1E, QL 1E, BIBAN 1E, VEPKI 1J 

15 JUL 2023

 1:600 000AD 2-VVCT-9-11 RNP RWY 06: DADEM 1E, MOXEB 1K, ENPAS 1K 

15 JUL 2023

 1:600 000AD 2-VVCT-9-15 RNP RWY 24: DADEM 1F, MOXEB 1F, ENPAS 1C, MOXEB 1L, ENPAS 1L 

15 JUL 2023

 1:500 000AD 2-VVCT-9-19 RNP RWY 24: RG 1F, QL 1F, BIBAN 1F, VEPKI 1K 

15 JUL 2023

   DIEN BIEN/Dien Bien   
 1:500 000AD 2-VVDB-9-1 RWY RWY 17: BQ 2A, BQ 2B, LADON 2A 

22 FEB 2024

 1:500 000AD 2-VVDB-9-3 RWY 17: BQ 2G, BQ 2H, LADON 2C 

22 FEB 2024

   QUANG BINH/Dong Hoi   
 1:600 000AD 2-VVDH-9-1 RWY 11: KAMSU 1T, KONCO 1T 

15 JUL 2023

 1:800 000AD 2-VVDH-9-3 RNP RWY 11: KAMSU 1M, KONCO 1M 

15 JUL 2023

 1:600 000AD 2-VVDH-9-7 RWY 29 KAMSU 1U, KONCO 1U 

15 JUL 2023

 1:800 000AD 2-VVDH-9-9 RNP RWY 29: KAMSU 1N, KONCO 1N 

15 JUL 2023

   DA LAT/Lien Khuong   
 1:500 000AD 2-VVDL-9-1 RWY 09: BMT 1E, CRA 1A, VETOM 1A 

13 JUN 2024

 1:750 000AD 2-VVDL-9-3 RNP 27: BMT 1F, SOSPA 1A, VETOM 1B 

13 JUN 2024

 1:750 000AD 2-VVDL-9-5 RNP RWY 09: BMT 1J, CRA 1B, VETOM 1F 13 JUN 2024
  AD 2-VVDL-9-7 RNP RWY 27: BMT 1K, CRA 1C, VETOM 1G 13 JUN 2024
   DA NANG/Da Nang   
 1:1 000 000AD 2-VVDN-9-1 RWY 17L/R: HUE 1A, CAHEO 1A, BUNTA 2A, ITBAM 1A, CQ 1A, SADIN 1A, VILOT 1A, PAPRA 2A 

15 JUL 2023

 1:1 000 000AD 2-VVDN-9-3 RWY 35L/R: HUE 1C, CAHEO 1C, BUNTA 2C, ITBAM 1C, CQ 1C, SADIN 1C, VILOT 1C, PAPRA 2C 

15 JUL 2023

 1:1 200 000AD 2-VVDN-9-5 RWY 35L/R: KONCO 1G, VIDEN 2G, PHULU 1G, BUNTA 2G, KUMUN 1G, SADIN 1G, XAQUA 1G, PAPRA 2G 

15 JUL 2023

   HA NOI/Noi Bai   
 1:500 000AD 2-VVNB-9-1 RWY 11L/R: TUSPO 2A, VITRA 2A, VINHA 2A, TONGA 2A, HUVAN 2A, PHUTA 2A 

20 MAR 2025

 1:500 000AD 2-VVNB-9-3 RWY 11L/R: TUSPO 2C, VINHA 2C, TRANA 2A, HUVAN 2C 

20 MAR 2025

 1:500 000AD 2-VVNB-9-5 RWY 29L/R: TUSPO 2B, VITRA 2B, VINHA 2B, TONGA 2B, HUVAN 2B, PHUTA 2B 

20 MAR 2025

 1:500 000AD 2-VVNB-9-7 RWY 11L/R; 29L/R: KADGA 3A, KADGA 3B 

20 MAR 2025

 1:1 200 000AD 2-VVNB-9-9 RNAV RWY 11L/R: 11L/R: DILEN 3A, NAKHA 3A, NAH 3A, MC 3A, HUVAN 3A, HUVAN 3B 

20 MAR 2025

 1:1 200 000AD 2-VVNB-9-13 RNAV RWY 11L/R: MC 3B 

20 MAR 2025

 1:1 200 000AD 2-VVNB-9-15 RNAV RWY 29L/R: DILEN 3C, DENMO 3C, NAKHA 3C, NAH 3C, NAH 3D, MC 3C, MC 3D, BQ 3C 

20 MAR 2025

   HUE/Phu Bai   
 1:500 000AD 2-VVPB-9-1 RWY 09: PHUVA 1A, ANTHU 1A, BACMA 1A, BACMA 1B, HUTRO 1A 

15 JUL 2023

 1:500 000AD 2-VVPB-9-3 RWY 27: PHUVA 1C, ANTHU 1C, BACMA 1C, HUTRO 1C 

15 JUL 2023

 1: 1 000 000AD 2-VVPB-9-5 RNP RWY 27: HUTRO 1E, PHUVA 1E 

15 JUL 2023

 1: 1 000 000AD 2-VVPB-9-7 RNP RWY 09: BIPHU 1A, HUTRO 2F 

15 JUL 2023

 1: 900 000AD 2-VVPB-9-11 RNP RWY 09: XILGA 1A, NAKHE 1B 

15 JUL 2023

 1: 900 000AD 2-VVPB-9-15 RNP RWY 27: NAKHE 1A 

15 JUL 2023

   BINH DINH/Phu Cat   
 1: 750 000AD 2-VVPC-9-1 RNP RWY 33: KUMUN 1A, KUMUN 1B, KAMGO 1A, NOBID 1K, NOBID 1L 

15 JUL 2023

 1: 750 000AD 2-VVPC-9-7 RNP RWY 15: KUMUN 1C, KAMGO 1C, NOBID 1M. 

15 JUL 2023

 1: 650 000AD 2-VVPC-9-11 RWY 33: KUMUN 1G 

15 JUL 2023

 1: 650 000AD 2-VVPC-9-13 RWY 33: KAMGO 1G, NOBID 1Q 

15 JUL 2023

 1: 650 000AD 2-VVPC-9-15 RWY 15: KUMUN 1H, KAMGO 1H, NOBID 1H 

15 JUL 2023

   GIA LAI/Pleiku   
 1: 650 000AD 2-VVPK-9-1 RWY 09: XAQUA 1R, SADIN 1R, CQ 1R, ENGIM 1R, MEVON 1R 

20 MAR 2025

 1: 750 000AD 2-VVPK-9-3 RNP RWY 09: DAN 1M, PATNO 1M, CQ 1M 

15 JUL 2023

 1: 750 000AD 2-VVPK-9-7 RNP RWY 09: BMT 2A 

20 MAR 2025

 1: 650 000AD 2-VVPK-9-9 RWY 27: XAQUA 1S, SADIN 1S, CQ 1S, ENGIM 1S, MEVON 1S  

20 MAR 2025

 1: 750 000AD 2-VVPK-9-11 RNP RWY 27: DAN 1N, PATNO 1N, CQ 1N 

15 JUL 2023

 1: 750 000AD 2-VVPK-9-15 RNP RWY 27: BMT 2B 

20 MAR 2025

   KIEN GIANG/Phu Quoc   
 1:500 000AD 2-VVPQ-9-1 RWY 28: OSOTA 1A, NUMDI 1A, TUNPO 1A, ADBOP 1A 

15 JUL 2023

 1:500 000AD 2-VVPQ-9-3 RWY 10: OSOTA 1B, NUMDI 1B, TUNPO 1B, ADBOP 1B 

15 JUL 2023

 1:600 000AD 2-VVPQ-9-5 RNP RWY 10: HOTUN 1D, MINTU 1A, NORTI 1A, NUMDI 1D, OSOTA 1D 

18 APR 2024

 1:600 000AD 2-VVPQ-9-9 RNP RWY 28: TRUMI 2A, HOTUN 1C, NUMDI 1C, OSOTA 1C, THILI 1C 

18 APR 2024

 1:600 000AD 2-VVPQ-9-13 RNP RWY 28: TATEM 1A 

18 APR 2024

   KIEN GIANG/Rach Gia   
 1:500 000AD 2-VVRG-9-1 RWY 08: POTIX 1A, TUNPO 1A, TRN 1A 

15 JUL 2023

 1:500 000AD 2-VVRG-9-3 RWY 26: POTIX 1B, TUNPO 1B, TRN 1B 

15 JUL 2023

 1:500 000AD 2-VVRG-9-5 RWY 08: POTIX 1D, TUNPO 1D, TRN 1D 

15 JUL 2023

 1:500 000AD 2-VVRG-9-7 RWY 26: POTIX 1E, TUNPO 1E, TRN 1E 

15 JUL 2023

 1:500 000AD 2-VVRG-9-9 RNP RWY 08: POTIX 1M, TRN 1M, DADEM 1M, KISAN 1M 

15 JUL 2023

 1:500 000AD 2-VVRG-9-13 RNP RWY 26: POTIX 1J, TRN 1J, DADEM 1J, KISAN 1J 

15 JUL 2023

   PHU YEN/Tuy Hoa   
 1:500 000AD 2-VVTH-9-1 RWY 21: KAMGO 1B, KARAN 1K 

31 AUG 2023

 1:500 000AD 2-VVTH-9-3 RWY 03: KAMGO 1E, KARAN 1J 

31 AUG 2023

 1:500 000AD 2-VVTH-9-5: RNP RWY 03: PCA 1N, KARAN 1N 31 AUG 2023
 1:500 000AD 2-VVTH-9-7: RNP RWY 21: PCA 1P, KARAN 1P 31 AUG 2023
   HO CHI MINH/Tan Son Nhat   
 1:500 000AD 2-VVTS-9-1 RWY 07R: ANRAN 1P, AC 1P, BAOMY 1P, BACHU 1P, BITIS 1P, ENPAS 1P, LANHI 1P, XOBAV 1P, KADUM 1P, MISAN 1P, SAPEN 1P, VTV 1P 

15 JUL 2023

 1:500 000AD 2-VVTS-9-3 RWY 07L: ANRAN 1Q, AC 1Q, BAOMY 1Q, BACHU 1Q, BITIS 1Q, ENPAS 1Q, LANHI 1Q, XOBAV 1Q, KADUM 1Q, MISAN 1Q, SAPEN 1Q, VTV 1Q 

15 JUL 2023

 1:500 000AD 2-VVTS-9-5 RWY 25L/R: AC 1R, BAOMY 1R, DONXO 1R, BITIS 1R, BACHU 1R, ENPAS 1R, LANHI 1R, XOBAV 1R, KADUM 1R, MISAN 1R, SAPEN 1R, VTV 1R 

15 JUL 2023

 1:750 000AD 2-VVTS-9-7 RNAV RWY 07L/R: BACHU 3A, KADUM 2A, MISAN 3A, SAPEN 3A 05 SEP 2024
 1:1 250 000AD 2-VVTS-9-11 RNAV RWY 07L/R: ANTRI 2B, ENPAS 2B, SAPEN 2B 

13 JUN 2024

 1:1 250 000AD 2-VVTS-9-15 RNAV RWY 07L/R: LANHI 2B, TANOS 2B 13 JUN 2024
 1:1 250 000AD 2-VVTS-9-17 RNAV RWY 07L/R: XOBAV 2B, MALAY 2B 

31 OCT 2023

 1:750 000AD 2-VVTS-9-19 RNAV RWY 07L/R: BACHU 2C, MISAN 2C 

31 OCT 2023

 1:1 250 000AD 2-VVTS-9-23 RNAV RWY 25L/R: ANTRI 2D, LANHI 2D 

13 JUN 2024

 1:1 250 000AD 2-VVTS-9-27 RNAV RWY 25L/R: TANOS 2D 

13 JUN 2024

 1:1 250 000AD 2-VVTS-9-29 RNAV RWY 25L/R: BACHU 2D, KADUM 2D, ENPAS 2D, XOBAV 2D, MISAN 2D, SAPEN 2D 

13 JUN 2024

 1:1 250 000AD 2-VVTS-9-35 RNAV RWY 25L/R: ANTRI 2E, LANHI 2E 

13 JUN 2024

 1:1 250 000AD 2-VVTS-9-39 RNAV RWY 25L/R: TANOS 2E 

13 JUN 2024

 1:750 000AD 2-VVTS-9-43 RNAV RWY 25L/R: ANTRI 2F 

13 JUN 2024

 1:750 000AD 2-VVTS-9-47 RNAV RWY 25L/R: KADUM 2F 

13 JUN 2024

 1:1 250 000AD 2-VVTS-9-51 RNAV RWY 25L/R: KADUM 2G 

05 SEP 2024

 1:1 250 000AD 2-VVTS-9-53 RNAV RWY 25L/R: KADUM 2K, SAPEN 2K 

05 SEP 2024

   THANH HOA/Tho Xuan   
 1:500 000AD 2-VVTX-9-1 RWY 31: NAH 1F, VIN 1A 

15 JUL 2023

 1:650 000AD 2-VVTX-9-3 RNP RWY 13: NAH 1M, VIN 1M 

15 JUL 2023

 1:750 000AD 2-VVTX-9-5 RNP RWY 31: NAH 1N, VIN 1N 

15 JUL 2023

 1:500 000AD 2-VVTX-9-7 RWY 13: NAH 1Q, VIN 1B 

15 JUL 2023

   VAN DON/Quang Ninh   
 1:500 000AD 2-VVVD-9-1 RWY 03: BACHE 1A, DOCHU 1A, HALAM 1A, CATBA 1A 

15 JUL 2023

 1:500 000AD 2-VVVD-9-3 RWY 21: BACHE 1B, DOCHU 1B, HALAM 1B, CATBA 1B 

15 JUL 2023

 1:500 000AD 2-VVVD-9-5 RNP RWY 03: SAMSU 1A, CATBA 1C, HALAM 1D, DOCHU 1D 

15 JUL 2023

 1:500 000AD 2-VVVD-9-7 RNP RWY 21: CATBA 1D, HALAM 1E, DOCHU 1E 

15 JUL 2023

   NGHE AN/Vinh   
 1:500 000AD 2-VVVH-9-1 RWY 17: NAH 1A, KAMSU 1A, IDOTA 1A 

15 JUL 2023

 1:500 000AD 2-VVVH-9-3 RNP RWY 17: HABAN 1E, CAURO 1E, MIBOS 1E 

15 JUL 2023

 1:500 000AD 2-VVVH-9-9 RWY 35: NAH 1B, KAMSU 1B, IDOTA 1B 

15 JUL 2023

 1:500 000AD 2-VVVH-9-11 RNP RWY 35: HABAN 1G, DULAG 1G, LALEB 1G, VETES 1G 

15 JUL 2023

Title of series

Scale

Name and/or number

Price

Date

Standard Arrival Chart Instrument (STAR) – ICAO

  BUON MA THUOT/Buon Ma Thuot   
1:500 000AD 2-VVBM-11-1 RWY 09/27: MEVON 1C, ENGIM 1C, NOBID 1C, ONEBI 2C,DOVIN 1C, ENRIN 1C, TANGO 1C 

15 JUL 2023

 1:500 000AD 2-VVBM-11-3 RWY 09/27: MEVON 1D, ENGIM 1D, NOBID 1D, ONEBI 2D, DOVIN 1D, ENRIN 1D, TSH 1D 

15 JUL 2023

 1:500 000AD 2-VVBM-11-5 RNP RWY 09: MEVON 2G, ENGIM 2G, NOBID 2G, ONEBI 3G, DOVIN 2G, PATMA 2G 

15 JUL 2023

 1:500 000AD 2-VVBM-11-11 RNP RWY 09: MEVON 2H, ENGIM 2H 

15 JUL 2023

 1:500 000AD 2-VVBM-11-15 RNP RWY 09: ONEBI 3H, DOVIN 2H 

15 JUL 2023

 1:500 000AD 2-VVBM-11-19 RNP RWY 27: MEVON 2J, ENGIM 2J, NOBID 2J, ONEBI 3J, DOVIN 2J, PATMA 2J 

15 JUL 2023

 1:500 000AD 2-VVBM-11-25 RNP RWY 27: MEVON 2K, ENGIM 2K 

15 JUL 2023

 1:500 000AD 2-VVBM-11-29 RNP RWY 27: ONEBI 3K, DOVIN 2K 

15 JUL 2023

   QUANG NAM/Chu Lai   
 1:450 000AD 2-VVCA-11-1 RWY 14/32: DAN 1J, BANSU 1C, KUMUN 1M 

15 JUL 2023

 1:500 000AD 2-VVCA-11-3 RNP RWY 14: DAN 1F, BANSU 1F, KUMUN 1Q 

15 JUL 2023

 1:500 000AD 2-VVCA-11-7 RNP RWY 32: DAN 1G, BANSU 1G, KUMUN 1R 

15 JUL 2023

   HAI PHONG/Cat Bi   
 1:500 000AD 2-VVCI-11-1 RWY 07/25: PHUTA 1H, VANUC 1F, NAH 1C 

15 JUL 2023

 1:500 000AD 2-VVCI-11-3 RWY 07: NOB 1A, NAH 1D 

15 JUL 2023

 1:500 000AD 2-VVCI-11-5 RNAV RWY 07: BATOT 1A, NAH 1J 

15 JUL 2023

 1:500 000AD 2-VVCI-11-9 RNAV RWY 07: BATOT 1B, PHUTA 1D 

15 JUL 2023

 1:500 000AD 2-VVCI-11-13 RNAV RWY 07: BATOT 1C, PHUTA 1E 

15 JUL 2023

 1:500 000AD 2-VVCI-11-17 RNAV RWY 25: BATOT 1D, NAH 1L 

15 JUL 2023

 1:500 000AD 2-VVCI-11-21 RNAV RWY 25: PHUTA 1F, VANUC 1D, VIBAO 1F 

15 JUL 2023

 1:500 000AD 2-VVCI-11-23 RNAV RWY 25: PHUTA 1G, VANUC 1E, VIBAO 1H 

15 JUL 2023

   CA MAU/Ca Mau   
 1:250 000AD 2-VVCM-11-1 RWY 09/27: TRN 1C 

15 JUL 2023

 1:250 000AD 2-VVCM-11-3 RNP RWY 09/27: TRN 1Q (RWY 09), TRN 1R (RWY 27) 

31 OCT 2023

   KHANH HOA/Cam Ranh   
 1:500 000AD 2-VVCR-11-1 RWY 02L/R – 20L/R: PHUSA 1A, SUIDA 1A, PANCA 1A, NHATA 1A 

15 JUL 2023

 1:500 000AD 2-VVCR-11-3 RWY 02L: PHUSA 1C, SUIDA 1C, PANCA 1C, NHATA 1C 

15 JUL 2023

 1:750 000AD 2-VVCR-11-5 RNP RWY 02L/R: ANKIN 1A, BANKE 1A, COTUN 2A, HUNTA 2A, SOTEN 1A 

15 JUL 2023

 1:750 000AD 2-VVCR-11-9 RNP RWY 20L/R: BANKE 1C, COTUN 3B, HUNTA 2B, PANLU 1B 

15 JUL 2023

   BA RIA - VUNG TAU/Con Dao   
 1:500 000AD 2-VVCS-11-1 RNP RWY 11: BODOD 2F, NIXIV 2F, VEPKI 1F 

15 JUL 2023

 1:500 000AD 2-VVCS-11-5 RNP RWY 29: BODOD 1G, NIXIV 1G, VEPKI 1G 

15 JUL 2023

 1:500 000AD 2-VVCS-11-9 RWY 11/29: NIXIV 1C, VEPKI 1C 

15 JUL 2023

   CAN THO/Can Tho   
 1:500 000AD 2-VVCT-11-1 RWY 06/24: CHUTA 3A, VINLO 3A, XUTHO 3A, DOTHA 3A, CANTO 2A, ANHOA 1A 

15 JUL 2023

 1:500 000AD 2-VVCT-11-3 RNP RWY 06: DADEM 1G, RG 1G, QL 1G, BIBAN 1G, VEPKI 1L, MOXEB 1G, ENPAS 1J 

15 JUL 2023

 1:500 000AD 2-VVCT-11-7 RNP RWY 06: DADEM 1H, RG 1H, QL 1H, BIBAN 1H, VEPKI 1M, MOXEB 1H, ENPAS 1H 

15 JUL 2023

   DIEN BIEN/Dien Bien   
 1:500 000AD 2-VVDB-11-1 RWY 35: BQ 2C, BQ 2D, LADON 2B 

22 FEB 2024

 1:500 000AD 2-VVDB-11-3 RWY 35: BQ 2E, BQ 2F 

22 FEB 2024

 1:500 000AD 2-VVDB-11-5 RNP RWY 35: BQ 2J, BQ 2K 

22 FEB 2024

   QUANG BINH/Dong Hoi   
 1:600 000AD 2-VVDH-11-1 RWY 11: KAMSU 1V, KONCO 1V 

15 JUL 2023

 1:800 000AD 2-VVDH-11-3 RNP RWY 11: KAMSU 1P, KONCO 1P 

15 JUL 2023

 1:800 000AD 2-VVDH-11-7 RNP RWY 11: KAMSU 1R, KONCO 1R 

15 JUL 2023

 1:600 000AD 2-VVDH-11-11 RWY 29: KAMSU 1W, KONCO 1W 

15 JUL 2023

 1:800 000AD 2-VVDH-11-13 RNP RWY 29: KAMSU 1Q, KONCO 1Q 

15 JUL 2023

 1:800 000AD 2-VVDH-11-17 RNAV RWY 29: KAMSU 1S, KONCO 1S 

15 JUL 2023

   DA LAT/Lien Khuong   
 1:500 000AD 2-VVDL-11-1 RWY 09: BMT 1G, SOSPA 1B, VETOM 1C 

13 JUN 2024

 1:500 000AD 2-VVDL-11-3 RWY 09: BMT 1H, VETOM 1D 

13 JUN 2024

 1:750 000AD 2-VVDL-11-5 RNP RWY 09: BMT 1L, BMT 1M, SOSPA 1C, KADUM 1B, ANTRI 1G, VETOM 1H, TANOS 1G 13 JUN 2024
  AD 2-VVDL-11-11 RNP RWY 27: BMT 1N, CRA 1D, KADUM 1C, ANTRI 1H, VETOM 1J, TANOS 1H 13 JUN 2024
   DA NANG/Da Nang   
 1:1 000 000AD 2-VVDN-11-1 RWY 17L/R, 35L/R: HUE 1D, CAHEO 1D, BUNTA 2D, CQ 1D, SADIN 1D, VILOT 1D, PAPRA 2D 

15 JUL 2023

 1:1 000 000AD 2-VVDN-11-3 RWY 17L/R, 35L/R: BUNTA 2E, CQ 1E 

15 JUL 2023

 1:1 000 000AD 2-VVDN-11-5 RWY 35L/R HUE 1F, CAHEO 1F, CQ 1F, SADIN 1F, VILOT 1F, PAPRA 2F 

15 JUL 2023

 1:750 000AD 2-VVDN-11-7 RNAV RWY 35L/R: HUE 2K, CAHEO 2K, BUNTA 2K, CQ 2K, KUMUN 2K, SADIN 2K, VILOT 2K, LATOM 2K, PAPRA 2K 

15 JUL 2023

 1:750 000AD 2-VVDN-11-13 RNAV RWY 35L/R: HUE 2M, CAHEO 2M, BUNTA 2M 

15 JUL 2023

 1:750 000AD 2-VVDN-11-17 RNAV RWY 35L/R: HUE 1L, CAHEO 1L, BUNTA 2L, CQ 2L, KUMUN 2L, SADIN 2L, VILOT 2L, LATOM 2L, PAPRA 2L 

15 JUL 2023

 1:750 000AD 2-VVDN-11-21 RNAV RWY 35L/R: HUE 1N, CAHEO 1N, BUNTA 2N 

15 JUL 2023

   HA NOI/Noi Bai   
 1:500 000AD 2-VVNB-11-1 RWY 11L/R: TUSPO 2A, NAH 1A, MC 1A, LAOCA 2A, BQ 3A, PHUTA 2A, XIVIN 1A 

20 MAR 2025

 1:500 000AD 2-VVNB-11-3 RWY 11L/R: KADGA 3A 

20 MAR 2025

 1:500 000AD 2-VVNB-11-5 RWY 29L/R: TUSPO 2B, NAH 1B, MC 2B, LAOCA 2B, BQ 3B, PHUTA 2B, XIVIN 1B 

20 MAR 2025

 1:1 200 000AD 2-VVNB-11-7 RNAV RWY 11L/R: DILEN 3E, NAKHA 3E, VDO 3E, PHUTA 3E, BISON 3E, MC 3E, HUVAN 3E 

20 MAR 2025

 1:1 200 000AD 2-VVNB-11-11 RNAV RWY 11L/R: DILEN 3F, NAKHA 3F, VDO 3F, PHUTA 3F 

20 MAR 2025

 1:1 200 000AD 2-VVNB-11-15 RNAV RWY 11L/R: BISON 3F, MC 3F, HUVAN 3F 

20 MAR 2025

 1:1 200 000AD 2-VVNB-11-19 RNAV RWY 11L/R: DILEN 3G, NAKHA 3G, VDO 3G, PHUTA 3G 

20 MAR 2025

 1:1 200 000AD 2-VVNB-11-23 RNAV RWY 11L/R: DILEN 3H, NAKHA 3H, VDO 3H, GASSO 3H, DOKLA 3H 

20 MAR 2025

 1:1 200 000AD 2-VVNB-11-27 RNAV RWY 11L/R: BISON 3H, MC 3H, HUVAN 3H 

20 MAR 2025

 1:1 200 000AD 2-VVNB-11-31 RNAV RWY 11L/R: DILEN 3J, NAKHA 3J, VDO 3J, GASSO 3J, DOKLA 3J 

20 MAR 2025

 1:1 200 000AD 2-VVNB-11-37 RNAV RWY 11L/R: BISON 3J, MC 3J, HUVAN 3J 

20 MAR 2025

 1:1 200 000AD 2-VVNB-11-41 RNAV RWY 11L/R: DILEN 3K, NAKHA 3K, VDO 3K, GASSO 3K, DOKLA 3K 

20 MAR 2025

 1:1 200 000AD 2-VVNB-11-47 RNAV RWY 29L/R: DILEN 3L, NAKHA 3L, BISON 3L, MC 3L, HUVAN 3L 

20 MAR 2025

 1:750 000AD 2-VVNB-11-51 RNAV RWY 29L/R: DILEN 3M, NAKHA 3M 

20 MAR 2025

 1:750 000AD 2-VVNB-11-55 RNAV RWY 29L/R: BISON 3M, MC 3M, HUVAN 3M 

20 MAR 2025

 1:750 000AD 2-VVNB-11-59 RNAV RWY 29L/R: DILEN 3N, NAKHA 3N, VDO 3N, GASSO 3N, DOKLA 3N 

20 MAR 2025

 1:750 000AD 2-VVNB-11-63 RNAV RWY 29L/R: BISON 3N, MC 3N, HUVAN 3N 

20 MAR 2025

 1:750 000AD 2-VVNB-11-67 RNAV RWY 29L/R: DILEN 3P, NAKHA 3P, VDO 3P, GASSO 3P, DOKLA 3P 

20 MAR 2025

 1:750 000AD 2-VVNB-11-73 RNAV RWY 29L/R: BISON 3P, MC 3P, HUVAN 3P 

20 MAR 2025

 1:750 000AD 2-VVNB-11-77 RWY 11L/R: BIVIM 1A TRANSITION 

20 MAR 2025

 1:750 000AD 2-VVNB-11-79 RWY 11L/R: BIVIM 1B TRANSITION 

20 MAR 2025

   HUE/Phu Bai   
 Not to scaleAD 2-VVPB-11-1 RWY 27: LATOM 1A 

15 JUL 2023

 1:500 000AD 2-VVPB-11-3 RWY 27: PHUVA 1A, ANTHU 1A, BACMA 1A, NAMBI 1A, HUTRO 1A 

15 JUL 2023

 1: 900 000AD 2-VVPB-11-5 RNP RWY 27: BIPHU 1A, HUTRO 2C, PHADE 2A 

15 JUL 2023

 1: 900 000AD 2-VVPB-11-9 RNP RWY 09: PHADE 1B, PHADE 1C 

15 JUL 2023

 1: 1 000 000AD 2-VVPB-11-15 RNP RWY 09: PHUVA 1C, TORED 1A 

15 JUL 2023

   BINH DINH/Phu Cat   
 1:750 000AD 2-VVPC-11-1 RNP RWY 33: KUMUN 1D, KUMUN 1E, KAMGO 1D, NOBID 1N 

15 JUL 2023

 1:750 000AD 2-VVPC-11-3 RNP RWY 15: KUMUN 1F, KAMGO 1F, NOBID 1P 

15 JUL 2023

 1:650 000AD 2-VVPC-11-5 RWY 33: KUMUN 1J, KAMGO 1J, NOBID 1R 

15 JUL 2023

   GIA LAI/Pleiku   
 1:650 000AD 2-VVPK-11-1 RWY 09/27: XAQUA 1T, SADIN 1T, CQ 1T, ENGIM 1T, MEVON 1T  

20 MAR 2025

 1:800 000AD 2-VVPK-11-3 RNP RWY 09: DAN 1P, CQ 2P, PATMA 1C, BMT 1C 

20 MAR 2025

 1:650 000AD 2-VVPK-11-7 RNP RWY 27: DAN 1Q, CQ 2Q, PATMA 1D, BMT 1D 

20 MAR 2025

 1:650 000AD 2-VVPK-11-11 RWY 09/27: XAQUA 1U, SADIN 1U, CQ 1U, ENGIM 1U, MEVON 1U  

20 MAR 2025

   KIEN GIANG/Phu Quoc   
 1:500 000AD 2-VVPQ-11-1 RWY 10/28: OSOTA 1A, NUMDI 1A, TUNPO 1A, ADBOP 1A 

15 JUL 2023

 1:500 000AD 2-VVPQ-11-3 RWY 28: TUNPO 1B, ADBOP 1B 

15 JUL 2023

 1:600 000AD 2-VVPQ-11-5 RNP RWY 10: TRUMI 1B, HOTUN 1F, NUMDI 1F, OSOTA 1F, THILI 1B 18 APR 2024
 1:600 000AD 2-VVPQ-11-9 RNP RWY 10: TATEM 1B 

15 JUL 2023

 1:600 000AD 2-VVPQ-11-11 RNP RWY 28: HOTUN 1E, MINTU 1B, NUMDI 1E, OSOTA 1E, TIHAN 1C 

15 JUL 2023

   KIEN GIANG/Rach Gia   
 1:500 000AD 2-VVRG-11-1 RWY 08/26: POTIX 1C, TUNPO 1C, TRN 1C 

15 JUL 2023

 1:500 000AD 2-VVRG-11-3 RWY 08/26: POTIX 1F, TUNPO 1F, TRN 1F 

15 JUL 2023

 1:500 000AD 2-VVRG-11-5 RWY 08/26: POTIX 1G, TUNPO 1G 

15 JUL 2023

 1:500 000AD 2-VVRG-11-7 RNP RWY 08: POTIX 1K, TRN 1K, DADEM 1K, KISAN 1K 

15 JUL 2023

 1:500 000AD 2-VVRG-11-11 RNP RWY 26: POTIX 1L, TRN 1L, DADEM 1L, KISAN 1L 

15 JUL 2023

   PHU YEN/Tuy Hoa   
 1:500 000AD 2-VVTH-11-1 RWY 21: KAMGO 1K, KARAN 1L 

31 AUG 2023

 1:500 000AD 2-VVTH-11-3 RWY 21: KAMGO 1L, KARAN 1M 31 AUG 2023
 1:500 000AD 2-VVTH-11-5 RNP RWY 03: KAMGO 1M, KARAN 1G 31 AUG 2023
 1:500 000AD 2-VVTH-11-7 RNP RWY 21: KAMGO 1N, KAMGO 1P, KARAN 1H 31 AUG 2023
   HO CHI MINH/Tan Son Nhat   
 1:500 000AD 2-VVTS-11-1 RWY 07L/R, 25L/R: AC 1S, BACHU 1S, BAOMY 1S, BITIS 1S, DONXO 1S, DONXO 1U, ENPAS 1S, XOBAV 1S, LANHI 1S, MISAN 1S, SAPEN 1S, VTV 1S 

15 JUL 2023

 1:500 000AD 2-VVTS-11-3 RWY 25L/R: AC 1T, BITIS 1T, BAOMY 1T, ENPAS 1T, MISAN 1T, BACHU 1T, SAPEN 1T 

15 JUL 2023

 1:1 000 000AD 2-VVTS-11-5 RNAV RWY 07L/R: SAPEN 2G, BITIS 2G 

22 FEB 2024

 1:1 000 000AD 2-VVTS-11-7 RNAV RWY 07L/R: VICAL 3G, DALAP 2G 

22 FEB 2024

 1:1 000 000AD 2-VVTS-11-11 RNAV RWY 25L/R: ELSAS 2H, BITIS 2H, VICAL 3H, SAPEN 2H 

22 FEB 2024

 1:1 000 000AD 2-VVTS-11-15 RNAV RWY 25L/R: DALAP 2H 

22 FEB 2024

 1:1 000 000AD 2-VVTS-11-19 RNAV RWY 25L/R: BITIS 2J, SAPEN 2J, VICAL 3J 

22 FEB 2024

 1:1 000 000AD 2-VVTS-11-23 RNAV RWY 25L/R: DALAP 2J 

22 FEB 2024

   THANH HOA/Tho Xuan   
 1:500 000AD 2-VVTX-11-1 RWY 13/31: NAH 1S, VIN 1C 

15 JUL 2023

 1:500 000AD 2-VVTX-11-3 RWY 31: NAH 1T, VIN 1D 

15 JUL 2023

 1:650 000AD 2-VVTX-11-5 RNP RWY 31: NAH 1R, VIN 1R 

15 JUL 2023

 1:450 000AD 2-VVTX-11-7 RNAV RWY 31: VIN 1S 

15 JUL 2023

 1:800 000AD 2-VVTX-11-9 RNP RWY 13: NAH 1P, VIN 1P 

15 JUL 2023

 1:500 000AD 2-VVTX-11-11 RNAV RWY 13: VIN 1Q 

15 JUL 2023

   VAN DON/Quang Ninh   
 1:500 000AD 2-VVVD-11-1 RWY 03/21: BACHE 1C, DOCHU 1C, HALAM 1C 

15 JUL 2023

 1:500 000AD 2-VVVD-11-3 RNP RWY 03: VAMAP 1A, DOCHU 1F, BACHE 1D 

15 JUL 2023

 1:500 000AD 2-VVVD-11-5 RNP RWY 21: HALAM 1F, DOCHU 1G, NAKHA 1A 

15 JUL 2023

   NGHE AN/Vinh   
 1:500 000AD 2-VVVH-11-1 RWY 17/35: NAH 1C, KAMSU 1C, IDOTA 1C 

15 JUL 2023

 1:500 000AD 2-VVVH-11-3 RWY 17/35: NAH 1D, KAMSU 1D, IDOTA 1D 

15 JUL 2023

 1:500 000AD 2-VVVH-11-5 RNP RWY 17: BUXEN 1H, GUKAL 1H, TEBIR 1H 

15 JUL 2023

 1:500 000AD 2-VVVH-11-9 RNAV RWY 17: BUXEN 1J, TEBIR 1J 

15 JUL 2023

 1:500 000AD 2-VVVH-11-15 RNP RWY 35: KAMSU 1K, CAURO 1K, GUKAL 1K, DOMPU 1K 

15 JUL 2023

 1:500 000AD 2-VVVH-11-21 RNAV RWY 35: KAMSU 1L, GUKAL 1L, DOMPU 1L 

15 JUL 2023

Title of series

Scale

Name and/or number

Price

Date

ATC Surveillance Minimum Altitude Chart – ICAO

  HAI PHONG/Cat Bi   
1:1 300 000AD 2-VVCI-12-1 

15 JUL 2023

  KHANH HOA/Cam Ranh   
 1:1 100 000AD 2-VVCR-12-1 

15 JUL 2023

   DIEN BIEN/Dien Bien   
 1:500 000AD 2-VVDB-12-1 

05 SEP 2024

   QUANG BINH/Dong Hoi   
 1:1 100 000AD 2-VVDH-12-1 

15 JUL 2023

   DA NANG/Da Nang   
 1:1 000 000AD 2-VVDN-12-1 

15 JUL 2023

   HA NOI/Noi Bai   
 1:1 000 000AD 2-VVNB-12-1 

20 MAR 2025 15 JUL 2023

   HO CHI MINH/Tan Son Nhat   
 1:1 400 000AD 2-VVTS-12-1 

15 JUL 2023

   THANH HOA/Tho Xuan   
 1:1 100 000AD 2-VVTX-12-1 

15 JUL 2023

   VAN DON/Quang Ninh   
 1:1 300 000AD 2-VVVD-12-1 

15 JUL 2023

   NGHE AN/Vinh   
 1:1 100 000AD 2-VVVH-12-1 

15 JUL 2023

Title of series

Scale

Name and/or number

Price

Date

Instrument Approach Chart (IAC) – ICAO

  BUON MA THUOT/Buon Ma Thuot   
1:500 000AD 2-VVBM-13-1: VOR Z RWY 09 

15 JUL 2023

 1:500 000AD 2-VVBM-13-3: VOR Y RWY 09 

15 JUL 2023

 1:500 000AD 2-VVBM-13-5: VOR X RWY 09 

15 JUL 2023

 1:500 000AD 2-VVBM-13-7: VOR W RWY 09 

15 JUL 2023

 1:500 000AD 2-VVBM-13-9: VOR V RWY 09 

15 JUL 2023

 1:500 000AD 2-VVBM-13-11: VOR Z RWY 27 

15 JUL 2023

 1:500 000AD 2-VVBM-13-13: VOR Y RWY 27 

15 JUL 2023

 1:500 000AD 2-VVBM-13-15: VOR X RWY 27 

15 JUL 2023

 1:500 000AD 2-VVBM-13-17: VOR W RWY 27 

15 JUL 2023

 1:500 000AD 2-VVBM-13-19: VOR V RWY 27 

15 JUL 2023

 1:500 000AD 2-VVBM-13-21: ILS Z RWY 09 

15 JUL 2023

 1:500 000AD 2-VVBM-13-23: ILS Y RWY 09 

15 JUL 2023

 1:500 000AD 2-VVBM-13-25: ILS X RWY 09 

15 JUL 2023

 1:500 000AD 2-VVBM-13-27: ILS W RWY 09 

15 JUL 2023

 1:500 000AD 2-VVBM-13-29: ILS V RWY 09 

15 JUL 2023

 1:500 000AD 2-VVBM-13-31: ILS U RWY 09 

15 JUL 2023

 1:500 000AD 2-VVBM-13-33: ILS T RWY 09 

15 JUL 2023

 1:500 000AD 2-VVBM-13-35: ILS S RWY 09 

15 JUL 2023

 1:500 000AD 2-VVBM-13-37: RNP Z RWY 09 

15 JUL 2023

 1:500 000AD 2-VVBM-13-39: RNP Y RWY 09 

15 JUL 2023

 1:500 000AD 2-VVBM-13-41: RNP X RWY 09 

15 JUL 2023

 1:500 000AD 2-VVBM-13-43: RNP Z RWY 27 

15 JUL 2023

 1:500 000AD 2-VVBM-13-45: RNP Y RWY 27 

15 JUL 2023

 1:500 000AD 2-VVBM-13-47: RNP X RWY 27 

15 JUL 2023

   QUANG NAM/Chu Lai   
 1:350 000AD 2-VVCA-13-1: VOR Z RWY 14 CAT A, B 

15 JUL 2023

 1:350 000AD 2-VVCA-13-3: VOR Y RWY 14 CAT C, D 

15 JUL 2023

 1:450 000AD 2-VVCA-13-5: RNP Z RWY 14 

15 JUL 2023

 1:350 000AD 2-VVCA-13-7: VOR Z RWY 32 CAT A, B 22 FEB 2024
 1:350 000AD 2-VVCA-13-9: VOR Y RWY 32 CAT C, D 

15 JUL 2023

 1:350 000AD 2-VVCA-13-11: ILS Z RWY 32 CAT A, B 

15 JUL 2023

 1:350 000AD 2-VVCA-13-13: ILS Y RWY 32 CAT C, D 

15 JUL 2023

 1:500 000AD 2-VVCA-13-15: RNP Z RWY 32 

15 JUL 2023

 1:500 000AD 2-VVCA-13-17: RNP Y RWY 32 

15 JUL 2023

 1:500 000AD 2-VVCA-13-19: ILS X RWY 32 

15 JUL 2023

 1:500 000AD 2-VVCA-13-21: ILS W RWY 32 

15 JUL 2023

   HAI PHONG/Cat Bi   
 1:500 000AD 2-VVCI-13-1: VOR RWY 25 

15 JUL 2023

 1:500 000AD 2-VVCI-13-3: VOR Y RWY 07 

15 JUL 2023

 1:500 000AD 2-VVCI-13-5: VOR Z RWY 07 

15 JUL 2023

 1:500 000AD 2-VVCI-13-7: ILS Y RWY 07 

15 JUL 2023

 1:500 000AD 2-VVCI-13-9: ILS Z RWY 07 

15 JUL 2023

 1:500 000AD 2-VVCI-13-11: ILS V RWY 07 

15 JUL 2023

 1:500 000AD 2-VVCI-13-13: RNP Z RWY 07 

15 JUL 2023

 1:500 000AD 2-VVCI-13-15: RNP Y RWY 07 

15 JUL 2023

 1:500 000AD 2-VVCI-13-17: ILS X RWY 07 

15 JUL 2023

 1:500 000AD 2-VVCI-13-19: ILS W RWY 07 

15 JUL 2023

 1:500 000AD 2-VVCI-13-21: RNP Z RWY 25 

15 JUL 2023

 1:500 000AD 2-VVCI-13-23: RNP Y RWY 25 

15 JUL 2023

   CA MAU/Ca Mau   
 1:250 000AD 2-VVCM-13-1: NDB RWY 09 CAT A, B 

15 JUL 2023

 1:250 000AD 2-VVCM-13-3: NDB RWY 09 CAT C 

15 JUL 2023

 1:250 000AD 2-VVCM-13-5: NDB RWY 27 CAT A, B 

15 JUL 2023

 1:250 000AD 2-VVCM-13-7: NDB RWY 27 CAT C 

15 JUL 2023

 1:250 000AD 2-VVCM-13-9: RNP Z RWY 09 31 OCT 2023
 1:250 000AD 2-VVCM-13-11: RNP Z RWY 27 31 OCT 2023
   KHANH HOA/Cam Ranh   
 Not to scaleAD 2-VVCR-13-1: VOR RWY 02L CAT A, B 

15 JUL 2023

 1:500 000AD 2-VVCR-13-3: VOR RWY 02L CAT C 

15 JUL 2023

 1:500 000AD 2-VVCR-13-5: VOR X RWY 20R 

15 JUL 2023

 1:500 000AD 2-VVCR-13-7: VOR Y RWY 20R 

15 JUL 2023

 1:500 000AD 2-VVCR-13-9: VOR Z RWY 20R 

15 JUL 2023

 1:500 000AD 2-VVCR-13-11: VOR Y RWY 20L 

15 JUL 2023

 1:500 000AD 2-VVCR-13-13: ILS X RWY 02L 

15 JUL 2023

 1:500 000AD 2-VVCR-13-15: ILS X RWY 02R 

15 JUL 2023

 1:500 000AD 2-VVCR-13-17: ILS Y RWY 02L 

15 JUL 2023

 1:500 000AD 2-VVCR-13-19: ILS Y RWY 02R 

15 JUL 2023

 1:500 000AD 2-VVCR-13-21: ILS Z RWY 02L 

15 JUL 2023

 1:500 000AD 2-VVCR-13-23: ILS Z RWY 02R 

15 JUL 2023

 1:500 000AD 2-VVCR-13-25: ILS X RWY 20L 

15 JUL 2023

 1:500 000AD 2-VVCR-13-27: ILS Y RWY 20L 

15 JUL 2023

 1:500 000AD 2-VVCR-13-29: ILS Z RWY 20L 

15 JUL 2023

 1:500 000AD 2-VVCR-13-31: RNP Y RWY 02L 

15 JUL 2023

 1:500 000AD 2-VVCR-13-33: RNP Y RWY 02R 

15 JUL 2023

 1:500 000AD 2-VVCR-13-35: RNP Y RWY 20L 

15 JUL 2023

 1:500 000AD 2-VVCR-13-37: RNP Y RWY 20R 

15 JUL 2023

 1:500 000AD 2-VVCR-13-39: RNP Z RWY 02L 

15 JUL 2023

 1:500 000AD 2-VVCR-13-41: RNP Z RWY 02R 

15 JUL 2023

 1:500 000AD 2-VVCR-13-43: RNP Z RWY 20L 

15 JUL 2023

 1:500 000AD 2-VVCR-13-45: RNP Z RWY 20R 

15 JUL 2023

   BA RIA - VUNG TAU/Con Dao   
 1:500 000AD 2-VVCS-13-1: NDB RWY 11 CAT A, B 

15 JUL 2023

 1:500 000AD 2-VVCS-13-3: NDB RWY 11 CAT C 

15 JUL 2023

 1:500 000AD 2-VVCS-13-5: NDB RWY 29 CAT A, B 

15 JUL 2023

 1:500 000AD 2-VVCS-13-7: NDB RWY 29 CAT C 

15 JUL 2023

 1:500 000AD 2-VVCS-13-9: VOR RWY 29 

15 JUL 2023

 1:500 000AD 2-VVCS-13-11: RNP Z RWY 11 

15 JUL 2023

 1:500 000AD 2-VVCS-13-13: RNP Y RWY 11 

15 JUL 2023

 1:500 000AD 2-VVCS-13-15: RNP Z RWY 29 

15 JUL 2023

 1:500 000AD 2-VVCS-13-17: RNP Y RWY 29 

15 JUL 2023

   CAN THO/Can Tho   
 1:500 000AD 2-VVCT-13-1: VOR RWY 06 

15 JUL 2023

 1:500 000AD 2-VVCT-13-3: VOR RWY 24 

15 JUL 2023

 1:500 000AD 2-VVCT-13-5: ILS RWY 06 

15 JUL 2023

 1:500 000AD 2-VVCT-13-7: RNP Z RWY 06 

15 JUL 2023

 1:500 000AD 2-VVCT-13-9: RNP Y RWY 06 

15 JUL 2023

 1:500 000AD 2-VVCT-13-11: ILS Y RWY 06 

15 JUL 2023

 1:500 000AD 2-VVCT-13-13: ILS X RWY 06 

15 JUL 2023

 1:500 000AD 2-VVCT-13-15: RNP Z RWY 24 

15 JUL 2023

 1:500 000AD 2-VVCT-13-17: RNP Y RWY 24 

15 JUL 2023

   DIEN BIEN/Dien Bien   
 1:500 000AD 2-VVDB-13-1: VOR X RWY 35 CAT A, B, C 

22 FEB 2024

 1:500 000AD 2-VVDB-13-3: VOR Y RWY 35 CAT C 

22 FEB 2024

 1:500 000AD 2-VVDB-13-5: VOR Z RWY 35 CAT A, B 

22 FEB 2024

 1:500 000AD 2-VVDB-13-7: RNP Y RWY 35 

08 AUG 2024

 1:400 000AD 2-VVDB-13-9: RNP Z RWY 35 

08 AUG 2024

   QUANG BINH/Dong Hoi   
 1:500 000AD 2-VVDH-13-1: VOR Z RWY 11 

15 JUL 2023

 1:500 000AD 2-VVDH-13-3: VOR Y RWY 11 

15 JUL 2023

 1:400 000AD 2-VVDH-13-5: RNP Z RWY 11 

15 JUL 2023

 1:400 000AD 2-VVDH-13-7: RNP Y RWY 11 

15 JUL 2023

 1:500 000AD 2-VVDH-13-9: VOR Z RWY 29 

15 JUL 2023

 1:500 000AD 2-VVDH-13-11: ILS W RWY 29 

15 JUL 2023

 1:500 000AD 2-VVDH-13-13: ILS Z RWY 29 

15 JUL 2023

 1:400 000AD 2-VVDH-13-15: ILS Y RWY 29 

15 JUL 2023

 1:400 000AD 2-VVDH-13-17: ILS X RWY 29 

15 JUL 2023

 1:400 000AD 2-VVDH-13-19: RNP Z RWY 29 

15 JUL 2023

 1:400 000AD 2-VVDH-13-21: RNP Y RWY 29 

15 JUL 2023

   DA LAT/Lien Khuong   
 1:500 000AD 2-VVDL-13-1: ILS Z RWY 09 CAT C, D 

13 JUN 2024

 1:500 000AD 2-VVDL-13-3: ILS Y RWY 09  

13 JUN 2024

 1:500 000AD 2-VVDL-13-5: ILS V RWY 09 CAT A, B 

13 JUN 2024

 1:500 000AD 2-VVDL-13-7: ILS X RWY 09 

13 JUN 2024

 1:500 000AD 2-VVDL-13-9: ILS W RWY 09 

13 JUN 2024

 1:500 000AD 2-VVDL-13-11: VOR Z RWY 09 CAT C, D 

13 JUN 2024

 1:500 000AD 2-VVDL-13-13: VOR Y RWY 09 CAT A, B 

13 JUN 2024

 1:500 000AD 2-VVDL-13-15: RNP Z RWY 09  13 JUN 2024
 1:500 000AD 2-VVDL-13-17: RNP Y RWY 09  

13 JUN 2024

 1:500 000AD 2-VVDL-13-19: RNP Z RWY 27  

13 JUN 2024

 1:500 000AD 2-VVDL-13-21: RNP Y RWY 27  

13 JUN 2024

   DA NANG/Da Nang   
 1:650 000AD 2-VVDN-13-1: VOR W RWY 17L 

15 JUL 2023

 1:400 000AD 2-VVDN-13-3: VOR X RWY 17L 

15 JUL 2023

 1:400 000AD 2-VVDN-13-5: VOR Y RWY 17L 

15 JUL 2023

 1:400 000AD 2-VVDN-13-7: VOR Z RWY 17L 

15 JUL 2023

 1:650 000AD 2-VVDN-13-9: VOR W RWY 17R 

15 JUL 2023

 1:400 000AD 2-VVDN-13-11: VOR X RWY 17R 

15 JUL 2023

 1:400 000AD 2-VVDN-13-13: VOR Y RWY 17R 

15 JUL 2023

 1:400 000AD 2-VVDN-13-15: VOR Z RWY 17R 

15 JUL 2023

 1:550 000AD 2-VVDN-13-17: VOR X RWY 35L 

15 JUL 2023

 1:550 000AD 2-VVDN-13-19: VOR Y RWY 35L 

15 JUL 2023

 1:550 000AD 2-VVDN-13-21: VOR Z RWY 35L 

15 JUL 2023

 1:550 000AD 2-VVDN-13-23: VOR X RWY 35R 

15 JUL 2023

 1:550 000AD 2-VVDN-13-25: VOR Y RWY 35R 

15 JUL 2023

 1:550 000AD 2-VVDN-13-27: VOR Z RWY 35R 

15 JUL 2023

 1:500 000AD 2-VVDN-13-29: ILS U RWY 35L 

15 JUL 2023

 1:500 000AD 2-VVDN-13-31: ILS V RWY 35L 

15 JUL 2023

 1:550 000AD 2-VVDN-13-33: ILS W RWY 35L 

15 JUL 2023

 1:550 000AD 2-VVDN-13-35: ILS Y RWY 35L 

15 JUL 2023

 1:550 000AD 2-VVDN-13-37: ILS Z RWY 35L 

15 JUL 2023

 1:500 000AD 2-VVDN-13-39: ILS U RWY 35R 

15 JUL 2023

 1:500 000AD 2-VVDN-13-41: ILS V RWY 35R 

15 JUL 2023

 1:550 000AD 2-VVDN-13-43: ILS W RWY 35R 

15 JUL 2023

 1:550 000AD 2-VVDN-13-45: ILS Y RWY 35R 

15 JUL 2023

 1:550 000AD 2-VVDN-13-47: ILS Z RWY 35R 

15 JUL 2023

 1:500 000AD 2-VVDN-13-49: RNP Y RWY 35L 

15 JUL 2023

 1:500 000AD 2-VVDN-13-51: RNP Z RWY 35L 

15 JUL 2023

 1:500 000AD 2-VVDN-13-53: RNP Y RWY 35R 

15 JUL 2023

 1:500 000AD 2-VVDN-13-55: RNP Z RWY 35R 

15 JUL 2023

   HA NOI/Noi Bai   
 1:500 000AD 2-VVNB-13-1: VOR Z RWY 11L 

20 MAR 2025

 1:500 000AD 2-VVNB-13-3: VOR Y RWY 11L 

20 MAR 2025

 1:500 000AD 2-VVNB-13-5: VOR Z RWY 11R 

20 MAR 2025

 1:500 000AD 2-VVNB-13-7: VOR Y RWY 11R 

20 MAR 2025

 1:500 000AD 2-VVNB-13-9: VOR RWY 29L 

15 JUL 2023

 1:500 000AD 2-VVNB-13-11: VOR Y RWY 29R 

15 JUL 2023

 1:500 000AD 2-VVNB-13-13: ILS Y RWY 11L CAT I 

20 MAR 2025

 1:500 000AD 2-VVNB-13-15: ILS X RWY 11L 

20 MAR 2025

 1:500 000AD 2-VVNB-13-17: ILS W RWY 11L 

20 MAR 2025

 1:500 000AD 2-VVNB-13-19: ILS Y RWY 11R CAT I & CAT II 

20 MAR 2025

 1:500 000AD 2-VVNB-13-21: ILS X RWY 11R CAT I & CAT II  20 MAR 2025
 1:500 000AD 2-VVNB-13-23: ILS W RWY 11R CAT I & CAT II 

20 MAR 2025

 1:500 000AD 2-VVNB-13-25: ILS Y RWY 29L 

20 MAR 2025

 1:500 000AD 2-VVNB-13-27: ILS X RWY 29L 

20 MAR 2025

 1:500 000AD 2-VVNB-13-29: ILS W RWY 29L 

20 MAR 2025

 1:500 000AD 2-VVNB-13-31: ILS V RWY 29L 

20 MAR 2025

 1:500 000AD 2-VVNB-13-33: ILS Y RWY 29R 

20 MAR 2025

 1:500 000AD 2-VVNB-13-35: ILS X RWY 29R 

20 MAR 2025

 1:500 000AD 2-VVNB-13-37: ILS W RWY 29R 

20 MAR 2025

 1:500 000AD 2-VVNB-13-39: RNP Z RWY 11L 

20 MAR 2025

 1:500 000AD 2-VVNB-13-41: RNP Y RWY 11L 

20 MAR 2025

 1:500 000AD 2-VVNB-13-43: RNP Z RWY 11R 

20 MAR 2025

 1:500 000AD 2-VVNB-13-45: RNP Y RWY 11R 

20 MAR 2025

 1:500 000AD 2-VVNB-13-47: RNP Z RWY 29L 

20 MAR 2025

 1:500 000AD 2-VVNB-13-49: RNP Y RWY 29L 

20 MAR 2025

 1:500 000AD 2-VVNB-13-51: RNP Z RWY 29R 

20 MAR 2025

 1:500 000AD 2-VVNB-13-53: RNP Y RWY 29R 

20 MAR 2025

   HUE/Phu Bai   
 1:500 000AD 2-VVPB-13-1: VOR RWY 27 

15 JUL 2023

 1:500 000AD 2-VVPB-13-3: ILS Z RWY 27 

15 JUL 2023

 1:500 000AD 2-VVPB-13-5: ILS Y RWY 27 

15 JUL 2023

 1:500 000AD 2-VVPB-13-7: RNP Z RWY 27 

15 JUL 2023

 1:500 000AD 2-VVPB-13-9: RNP Z RWY 09 

15 JUL 2023

   BINH DINH/Phu Cat   
 1:500 000AD 2-VVPC-13-1: RNP Z RWY 33 

15 JUL 2023

 1:500 000AD 2-VVPC-13-3: RNP Y RWY 33 

15 JUL 2023

 1:500 000AD 2-VVPC-13-5: ILS Z RWY 33 

15 JUL 2023

 1:500 000AD 2-VVPC-13-7: ILS Y RWY 33 

15 JUL 2023

 1:500 000AD 2-VVPC-13-9: RNP Z RWY 15 

15 JUL 2023

 1:500 000AD 2-VVPC-13-11: RNP Y RWY 15 

15 JUL 2023

 1:600 000AD 2-VVPC-13-13: VOR Z RWY 33 CAT A, B 

15 JUL 2023

 1:600 000AD 2-VVPC-13-15: VOR Y RWY 33 CAT C, D 

15 JUL 2023

 1:600 000AD 2-VVPC-13-17: ILS X RWY 33 CAT A, B 

15 JUL 2023

 1:600 000AD 2-VVPC-13-19: ILS W RWY 33 CAT C, D 

15 JUL 2023

   GIA LAI/Pleiku   
 1:650 000AD 2-VVPK-13-1: VOR Z RWY 09 CAT A, B 

20 MAR 2025

 1:650 000AD 2-VVPK-13-3: VOR Y RWY 09 CAT C, D 

20 MAR 2025

 1:650 000AD 2-VVPK-13-5: VOR X RWY 09 

20 MAR 2025

 1:650 000AD 2-VVPK-13-7: VOR Z RWY 27 CAT A, B 

20 MAR 2025

 1:650 000AD 2-VVPK-13-9: VOR Y RWY 27 CAT C, D  

20 MAR 2025

 1:650 000AD 2-VVPK-13-11: VOR X RWY 27 

20 MAR 2025

 1:550 000AD 2-VVPK-13-13: ILS X RWY 27 

20 MAR 2025

 1:550 000AD 2-VVPK-13-15: ILS W RWY 27 

20 MAR 2025

 1:550 000AD 2-VVPK-13-17: RNP Z RWY 09 

20 MAR 2025

 1:550 000AD 2-VVPK-13-19: RNP Y RWY 09 

20 MAR 2025

 1:550 000AD 2-VVPK-13-21: RNP Z RWY 27 

20 MAR 2025

 1:550 000AD 2-VVPK-13-23: RNP Y RWY 27 

20 MAR 2025

 1:550 000AD 2-VVPK-13-25: ILS Z RWY 27 CAT A, B 

20 MAR 2025

 1:550 000AD 2-VVPK-13-27: ILS Y RWY 27 CAT C, D 

20 MAR 2025

 1:550 000AD 2-VVPK-13-29: ILS U RWY 27 

20 MAR 2025

   KIEN GIANG/Phu Quoc   
 1:500 000AD 2-VVPQ-13-1: VOR RWY 10 

15 JUL 2023

 1:500 000AD 2-VVPQ-13-3: VOR RWY 28 

15 JUL 2023

 1:500 000AD 2-VVPQ-13-5: ILS RWY 10 

15 JUL 2023

 1:500 000AD 2-VVPQ-13-7: ILS RWY 28 

15 JUL 2023

 1:600 000AD 2-VVPQ-13-9: RNP Z RWY 10 

15 JUL 2023

 1:600 000AD 2-VVPQ-13-11: RNP Y RWY 10 

15 JUL 2023

 1:600 000AD 2-VVPQ-13-13: RNP X RWY 10 

15 JUL 2023

 1:600 000AD 2-VVPQ-13-15: ILS Z RWY 10 

15 JUL 2023

 1:600 000AD 2-VVPQ-13-17: ILS Y RWY 10 

15 JUL 2023

 1:600 000AD 2-VVPQ-13-19: ILS X RWY 10 

15 JUL 2023

 1:600 000AD 2-VVPQ-13-21: RNP Z RWY 28 

31 AUG 2023

 1:600 000AD 2-VVPQ-13-23: RNP Y RWY 28 

31 AUG 2023

 1:600 000AD 2-VVPQ-13-25: RNP X RWY 28 

31 AUG 2023

 1:600 000AD 2-VVPQ-13-27: ILS Z RWY 28 

15 JUL 2023

 1:600 000AD 2-VVPQ-13-29: ILS Y RWY 28 

15 JUL 2023

 1:600 000AD 2-VVPQ-13-31: ILS X RWY 28 

15 JUL 2023

   KIEN GIANG/Rach Gia   
 1:500 000AD 2-VVRG-13-1: NDB RWY 08 CAT A, B 

15 JUL 2023

 1:500 000AD 2-VVRG-13-3: NDB RWY 08 CAT C 

15 JUL 2023

 1:500 000AD 2-VVRG-13-5: NDB RWY 26 CAT A, B 

15 JUL 2023

 1:500 000AD 2-VVRG-13-7: NDB RWY 26 CAT C 

15 JUL 2023

 1:500 000AD 2-VVRG-13-9: VOR RWY 08 

15 JUL 2023

 1:500 000AD 2-VVRG-13-11: VOR Z RWY 26 

15 JUL 2023

 1:500 000AD 2-VVRG-13-13: VOR Y RWY 26 

15 JUL 2023

 1:450 000AD 2-VVRG-13-15: RNP Z RWY 08 

15 JUL 2023

 1:450 000AD 2-VVRG-13-17: RNP Z RWY 26 

15 JUL 2023

 1:400 000AD 2-VVRG-13-19: RNP Y RWY 26 

15 JUL 2023

   PHU YEN/Tuy Hoa   
 1:500 000AD 2-VVTH-13-1: VOR Z RWY 21 

31 AUG 2023

 1:500 000AD 2-VVTH-13-3: ILS Z RWY 21 

31 AUG 2023

 1:500 000AD 2-VVTH-13-5: RNP Z RWY 03 

31 AUG 2023

 1:500 000AD 2-VVTH-13-7: RNP Y RWY 03 

31 AUG 2023

 1:500 000AD 2-VVTH-13-9: RNP Z RWY 21 31 AUG 2023
 1:500 000AD 2-VVTH-13-11: RNP Y RWY 21 31 AUG 2023
 1:500 000AD 2-VVTH-13-13: ILS Y RWY 21 31 AUG 2023
 1:500 000AD 2-VVTH-13-15: ILS X RWY 21 31 AUG 2023
   HO CHI MINH/Tan Son Nhat   
 1:500 000AD 2-VVTS-13-1: VOR RWY 07R 

15 JUL 2023

 1:500 000AD 2-VVTS-13-3: VOR RWY 07L 

15 JUL 2023

 1:500 000AD 2-VVTS-13-5: VOR RWY 25R 

15 JUL 2023

 1:500 000AD 2-VVTS-13-7: VOR RWY 25L 

15 JUL 2023

 1:500 000AD 2-VVTS-13-9: ILS Y RWY 25R 

15 JUL 2023

 1:500 000AD 2-VVTS-13-11: ILS Y RWY 25L 

15 JUL 2023

 1:500 000AD 2-VVTS-13-13: RNP RWY 07R 

15 JUL 2023

 1:500 000AD 2-VVTS-13-15: ILS X RWY 25L RNAV Transition 

15 JUL 2023

 1:500 000AD 2-VVTS-13-17: RNP RWY 25L 

15 JUL 2023

 1:500 000AD 2-VVTS-13-19: ILS X RWY 25R RNAV Transition 

15 JUL 2023

 1:500 000AD 2-VVTS-13-21: RNP RWY 25R 

15 JUL 2023

 1:500 000AD 2-VVTS-13-23: RNP RWY 07L 

15 JUL 2023

 1:500 000AD 2-VVTS-13-25: ILS Z RWY 07R 

15 JUL 2023

 1:500 000AD 2-VVTS-13-27: ILS Y RWY 07R 

15 JUL 2023

 1:500 000AD 2-VVTS-13-29: ILS X RWY 07R RNAV Transition 

15 JUL 2023

 1:500 000AD 2-VVTS-13-31: ILS W RWY 07R RNAV Transition 

23 JAN 2025

 1:500 000AD 2-VVTS-13-33: ILS W RWY 25L RNAV Transition 

23 JAN 2025

 1:500 000AD 2-VVTS-13-35: ILS W RWY 25R RNAV Transition 

23 JAN 2025

 1:500 000AD 2-VVTS-13-37: RNP Y RWY 07L 

23 JAN 2025

 1:500 000AD 2-VVTS-13-39: RNP Y RWY 07R 

23 JAN 2025

 1:500 000AD 2-VVTS-13-41: RNP Y RWY 25L 

23 JAN 2025

 1:500 000AD 2-VVTS-13-43: RNP Y RWY 25R 

23 JAN 2025

   THANH HOA/Tho Xuan   
 1:500 000AD 2-VVTX-13-1: VOR Y RWY 31 

15 JUL 2023

 1:500 000AD 2-VVTX-13-3: VOR Z RWY 31 

15 JUL 2023

 1:450 000AD 2-VVTX-13-5: ILS V RWY 31 

15 JUL 2023

 1:450 000AD 2-VVTX-13-7: ILS W RWY 31 

15 JUL 2023

 1:500 000AD 2-VVTX-13-9: ILS X RWY 31 

15 JUL 2023

 1:500 000AD 2-VVTX-13-11: ILS Y RWY 31 

15 JUL 2023

 1:500 000AD 2-VVTX-13-13: ILS Z RWY 31 

15 JUL 2023

 1:450 000AD 2-VVTX-13-15: RNP Y RWY 31 

15 JUL 2023

 1:450 000AD 2-VVTX-13-17: RNP Z RWY 31 

15 JUL 2023

 1:550 000AD 2-VVTX-13-19: RNP Y RWY 13 

15 JUL 2023

 1:550 000AD 2-VVTX-13-21: RNP Z RWY 13 

15 JUL 2023

 1:500 000AD 2-VVTX-13-23: VOR Z RWY 13 CAT A, B 

15 JUL 2023

 1:500 000AD 2-VVTX-13-25: VOR Y RWY 13 CAT C, D 

15 JUL 2023

   VAN DON/Quang Ninh   
 1:500 000AD 2-VVVD-13-1: VOR Y RWY 03 

28 FEB 2023

 1:500 000AD 2-VVVD-13-3: VOR Z RWY 03 CAT A, B 

28 FEB 2023

 1:500 000AD 2-VVVD-13-5: VOR Z RWY 03 CAT C, D 

15 JUL 2023

 1:500 000AD 2-VVVD-13-7: VOR Z RWY 21 CAT A, B 

15 JUL 2023

 Not to scaleAD 2-VVVD-13-9: VOR Z RWY 21 CAT C, D 

15 JUL 2023

 1:500 000AD 2-VVVD-13-11: ILS Z RWY 03 CAT A, B 

15 JUL 2023

 1:500 000AD 2-VVVD-13-13: ILS Z RWY 03 CAT C, D 

15 JUL 2023

 1:500 000AD 2-VVVD-13-15: ILS Y RWY 03 

15 JUL 2023

 1:500 000AD 2-VVVD-13-17: RNP Z RWY 03 

15 JUL 2023

 1:500 000AD 2-VVVD-13-19: RNP Y RWY 03 

15 JUL 2023

 1:500 000AD 2-VVVD-13-21: ILS W RWY 03 

15 JUL 2023

 1:500 000AD 2-VVVD-13-23: ILS X RWY 03 

15 JUL 2023

 1:500 000AD 2-VVVD-13-25: RNP Z RWY 21 

15 JUL 2023

 1:500 000AD 2-VVVD-13-27: RNP Y RWY 21 

15 JUL 2023

 1:500 000AD 2-VVVD-13-29: ILS V RWY 03 

15 JUL 2023

 1:500 000AD 2-VVVD-13-31: ILS U RWY 03 

15 JUL 2023

   NGHE AN/Vinh   
 1:500 000AD 2-VVVH-13-1: VOR Y RWY 17 

15 JUL 2023

 1:500 000AD 2-VVVH-13-3: VOR Z RWY 17 

15 JUL 2023

 1:500 000AD 2-VVVH-13-5: ILS Z RWY 17 

15 JUL 2023

 1:500 000AD 2-VVVH-13-7: ILS V RWY 17 

15 JUL 2023

 1:500 000AD 2-VVVH-13-9: ILS U RWY 17 

15 JUL 2023

 1:500 000AD 2-VVVH-13-11: RNP Z RWY 17 

15 JUL 2023

 1:500 000AD 2-VVVH-13-13: RNP Y RWY 17 

15 JUL 2023

 1:500 000AD 2-VVVH-13-15: ILS X RWY 17 

15 JUL 2023

 1:500 000AD 2-VVVH-13-17: ILS W RWY 17 

15 JUL 2023

 1:500 000AD 2-VVVH-13-19: VOR Y RWY 35 

15 JUL 2023

 1:500 000AD 2-VVVH-13-21: VOR Z RWY 35 

15 JUL 2023

 1:500 000AD 2-VVVH-13-23: RNP Z RWY 35 

15 JUL 2023

 1:500 000AD 2-VVVH-13-25: RNP Y RWY 35 

15 JUL 2023

Title of series

Scale

Name and/or number

Price

Date

Visual Approach Chart (VAC) – ICAO

  BUON MA THUOT/Buon Ma Thuot   
1:250 000AD 2-VVBM-14-1 

15 JUL 2023

  QUANG NAM/Chu Lai   
 1:300 000AD 2-VVCA-14-1 

15 JUL 2023

   HAI PHONG/Cat Bi   
 1:300 000 AD 2-VVCI-14-1 

15 JUL 2023

   CA MAU/Ca Mau   
 1:250 000AD 2-VVCM-14-1 

15 JUL 2023

   KHANH HOA/Cam Ranh   
 1:250 000AD 2-VVCR-14-1 

15 JUL 2023

   BA RIA - VUNG TAU/Con Dao   
 1:250 000AD 2-VVCS-14-1 

15 JUL 2023

   CAN THO/Can Tho   
 1:250 000AD 2-VVCT-14-1 

15 JUL 2023

   DIEN BIEN/Dien Bien   
 1:500 000AD 2-VVDB-14-1 

22 FEB 2024

   QUANG BINH/Dong Hoi   
 1:500 000AD 2-VVDH-14-1 

15 JUL 2023

   DA LAT/Lien Khuong   
 1:250 000AD 2-VVDL-14-1 13 JUN 2024
   DA NANG/Da Nang   
 1:250 000AD 2-VVDN-14-1 

15 JUL 2023

   HA NOI/Noi Bai   
 1:500 000AD 2-VVNB-14-1 

15 JUL 2023

   HUE/Phu Bai   
 1:500 000 AD 2-VVPB-14-1 

15 JUL 2023

   BINH DINH/Phu Cat   
 1:500 000 AD 2-VVPC-14-1 

15 JUL 2023

   GIA LAI/Pleiku   
 1:500 000 AD 2-VVPK-14-1  20 MAR 2025

15 JUL 2023

   KIEN GIANG/Phu Quoc   
 1:500 000 AD 2-VVPQ-14-1 

15 JUL 2023

   KIEN GIANG/Rach Gia   
 1:500 000 AD 2-VVRG-14-1 

15 JUL 2023

   PHU YEN/Tuy Hoa   
 1:250 000 AD 2-VVTH-14-1 

31 AUG 2023

   HO CHI MINH/Tan Son Nhat   
 1:250 000AD 2-VVTS-14-1 

15 JUL 2023

   THANH HOA/Tho Xuan   
 1:250 000AD 2-VVTX-14-1 

15 JUL 2023

   VAN DON/Quang Ninh   
 1:500 000AD 2-VVVD-14-1 

15 JUL 2023

   NGHE AN/Vinh   
 1:500 000AD 2-VVVH-14-1 

15 JUL 2023

Visual Departure Chart - ICAO

  QUANG NAM/Chu Lai   
1:500 000AD 2-VVCA-14-3 15 JUL 2023
   CA MAU/Ca Mau   
 1:500 000AD 2-VVCM-14-3 15 JUL 2023
   BA RIA - VUNG TAU/Con Dao   
 1:250 000

AD 2-VVCS-14-3

 15 JUL 2023
   HUE/Phu Bai   
 1:500 000AD 2-VVPB-14-3 15 JUL 2023
   KIEN GIANG/Rach Gia   
 1:500 000AD 2-VVRG-14-3 15 JUL 2023
   PHU YEN/Tuy Hoa   
 1:500 000AD 2-VVTH-14-3 31 AUG 2023

En-route Chart (ENRC) - ICAO

Not to scaleENR 6-2 15 JUL 2023

6  Index to the World Aeronautical Chart (WAC) — ICAO 1:1 000 000

To be developed

7  Topographical Charts

To supplement the aeronautical charts, a wide range topographical charts is available from:

Post:

Viet Nam General Department of Land Administration
Cartographic Publishing House
73 Nguyen Chi Thanh street
Ha Noi, Viet Nam

Telephone:   +84 24 38343812; +84 24 38344168

Fax:   +84 24 38344610