AIP Supplement for VIET NAM

AIP SUP

32/24

Effective from 20 AUG 2024

to 20 NOV 2024

Published on 20 AUG 2024

  CONSTRUCTION OF RUNWAY STRIP AND RUNWAY END SAFETY AREA AT PHU BAI INTERNATIONAL AIRPORT (VVPB)

1 — INTRODUCTION

This section supplements the following portion(s) of the AIP: AD.

This AIP Supplement aims at notifying the construction of RWY Strip and Runway End Safety Area (RESA) at Phu Bai International Airport (VVPB).

2 — DETAILS

2.1  Construction areas

Note:

  1. Construction areas are equipped by marker boards, flags and warning lights as assigned.

  1. Pilot must follow strictly ATC's clearances.

NOTAM A2048/24 has been published to notify this content.

2.1.1  Area 1: PAPI at the beginning of RWY 09.

2.1.2  Area 2: The edge of RWY strip from TWY E2 to Glide Path of RWY 27.

2.1.3  Area 3: RESA at the beginning of RWY 27.

Details of construction areas: See page AIP SUP 32/24-2.

2.2  Construction period: Construction during period having no flight operation, from 0000 to 1659 daily, from 20 AUG 2024 to 20 NOV 2024.

2.3  Aircraft operational procedure during construction period: Applied as current procedure.

3 — EFFECT

This AIP Supplement becomes effective from 0000 on 20/08/2024 to 1659 on 20/11/2024.

Any change relating to this AIP Supplement shall be notified by NOTAM.

4 — CANCELLATION

This AIP Supplement supersedes NOTAM A2048/24.

This AIP Supplement consists of 1 attachment as follows:

Layout of construction areas: From 0000 on 20 AUG 2024 to 1659 on 20 NOV 2024.